🇨🇳
China Import preparation

XIAN ELECTRIC ENGINEERING CO LTD

?About the companyShipments are growing — recent months show higher volumes than the start of the period.7 HS product groups in shipment history — a clear picture of the company's range.80 shipments on record — the basis for the reliability rating.

Supplier from China · 7 TANG XING ROAD XIAN P.R. CHINA. 80 shipments over 2025–2026, average price $28,840. Main product — iron or steel; articles, n.e.c. in chapter 73 (HS 7326909807). We'll prepare your import from this supplier — from analysis to contract.

Vedzilla is an import-preparation service: we help set up imports from this company to your country (CIS, Central Asia). Logistics and customs clearance are arranged by the importer.

Turnkey project management — from $250/mo
Free review · we reply during business hours
Shipments
80
rating
Period
2025–2026
of shipments
Average price
$28 840
per shipment
Total volume
$2 307 220
at least
Product groups: 8536901000·Electrical apparatus for switching, protecting electrical circuits, for making connections to or in electrical circuits, for a voltage not exceeding 1000 volts; connectors for optical fibres, optical fibre bundles or cables 7326200009·Iron or steel; articles, n.e.c. in chapter 73 7326909807·Iron or steel; articles, n.e.c. in chapter 73 8544700000·Insulated wire, cable and other electric conductors, connector fitted or not; optical fibre cables of individually sheathed fibres, whether or not assembled with electric conductors or fitted with connectors 7308200000·Structures of iron or steel and parts thereof; plates, rods, angles, shapes, sections, tubes and the like, prepared for use in structures 7614100000·Aluminium; stranded wire, cables, plaited bands and the like, (not electrically insulated) 7312109809·Stranded wire, ropes, cables, plaited bands, slings and the like, of iron or steel, not electrically insulated

What XIAN ELECTRIC ENGINEERING CO LTD supplies

7 HS codes · prices from real shipments
HS codeGoodsShipmentsPrice, $ (min–max)
7326909807
Iron or steel; articles, n.e.c. in chapter 73
41 Thimbles made of ferrous metals - 84 pcs. as part of the implementa 36 $188 – $6 743
7326200009
Iron or steel; articles, n.e.c. in chapter 73
42 Terminator made of ferrous metal wire - 84 pcs. as part of the impl 18 $192 – $9 176
7308200000
Structures of iron or steel and parts thereof; plates, rods, angles, shapes, sections, tubes and the like, prepared for use in structures
1. АНКЕРНЫЕ И САМОУПОРНЫЕ БАШНИ ИЗ СТАЛЬНОЙ РЕШЕТКИ В КОМПЛЕКТЕ СО ВСЕ 9 $2 761 – $449 501
8536901000
Electrical apparatus for switching, protecting electrical circuits, for making connections to or in electrical circuits, for a voltage not exceeding 1000 volts; connectors for optical fibres, optical fibre bundles or cables
44 Terminator for transitions from OPG to FOC transmission lines with 8 $156 – $4 857
8544700000
Insulated wire, cable and other electric conductors, connector fitted or not; optical fibre cables of individually sheathed fibres, whether or not assembled with electric conductors or fitted with connectors
6 Optical cable OPGW 1-48 G652FOCL 1-48 G652 - meters as part of the i 6 $90 468 – $119 719
7614100000
Aluminium; stranded wire, cables, plaited bands and the like, (not electrically insulated)
1. Провод сталеалюминиевый неизолированный АС 400/51, ГОСТ 839-80/Bare 2 $4 252 – $7 579
7312109809
Stranded wire, ropes, cables, plaited bands, slings and the like, of iron or steel, not electrically insulated
1. Канат одинарной свивки ТК-70 11,0-Г-1-Ж-P-1176(120)/Single lay rope 1 $37 922 – $37 922
Turnkey import preparation
Monthly project management: supplier analysis, negotiations, delivery costing and contract preparation. You get a result, not disjointed services. Logistics and customs are not included.
from $250/mo
First review is free

How the project works

4 stages: analysis → negotiations → costing → contract
1
SHIPMENT ANALYSIS
⏱ 3 days

We analyze the supplier

“I want to know if this supplier is reliable — how much they ship, what volumes”

Shipments by monthrating
6
2
4
34
34
JanJulAugJanFeb
Shipment trend and regularity
Product groups (HS codes) and prices
Conclusion: reliability and what to watch for
Included in the project
2
NEGOTIATIONS
⏱ 5 days

We send a request

“I want to start working with this supplier — are they open to negotiate?”

This is what a negotiation report looks likesample
Vedzilla → seller
Request for quotation. Delivery to your country. MOQ and prices?
seller reply (sample)
MOQ 200 pcs. Lead time 3–4 weeks. Ready to work with your region.
Main product per shipment data: Iron or steel; articles, n.e.c. in chapter 73 · HS codes 7326909807
Indicative price from shipments: $28 840
We'll request a quote, MOQ, lead time and readiness to ship to your country
Illustration of the format. We handle correspondence with the seller as part of the project — real answers will be in your report.
Included in the project
3
DELIVERY COST
⏱ 1 day

We calculate the full delivery cost

“I want to know how much delivery to us will cost”

Delivery cost → to youexample
Goods cost (EXW)$28 850
Freight to border+ $2 310
Duty + VAT on import+ $9 970
Broker fee+ $350
Total turnkey$41 480
Estimate for a typical batch (average shipment value — $28 840). Exact costing depends on your volume and terms.
Included in the project
4
CONTRACT
⏱ 2 days

We prepare the deal contract

“I've agreed terms with the seller — I need a proper contract”

Contract — sample structureRU / EN
INTERNATIONAL SALE AND PURCHASE AGREEMENT
«__» ________ 2026 г.
Seller: XIAN ELECTRIC ENGINEERING CO LTD, China
Buyer: company “__________”, your country
Subject: Iron or steel; articles, n.e.c. in chapter 73 · HS codes 7326909807
Terms: Incoterms — to be agreed
Price · Arbitration · Force majeure · ███████████
Prepared for bank currency control
Bilingual: Russian + English
Sample structure. We tailor the contract to your specific deal.
Included in the project

Import preparation: what's included

We prepare your import from this supplier in China — iron or steel; articles, n.e.c. in chapter 73 (HS 7326909807): we vet the company against real shipments, negotiate in its language, calculate the full delivery cost to you (duty, VAT, freight to border) and prepare a foreign trade contract for your bank's currency control.

Other suppliers: Articles of iron or steel

FAQ

What do you know about the supplier XIAN ELECTRIC ENGINEERING CO LTD?+
Based on shipment data: 80 shipments over 2025–2026, main product — Iron or steel; articles, n.e.c. in chapter 73, average shipment value — $28,840. A total of 7 HS product groups. The more confirmed shipments, the higher the reliability rating.
What does project management include?+
We analyse and vet this supplier (shipments, prices, rating), negotiate in their language, calculate the delivery cost to you, and prepare a contract suited to your bank. Logistics and customs clearance are not included.
How do negotiations with the supplier work?+
We send a quote request, including for “Iron or steel; articles, n.e.c. in chapter 73”, correspond in English and the supplier's language, clarify prices, minimum order quantity, lead times and willingness to work with your country. The result is a report with the supplier's answers.
How much does delivery from China cost?+
It depends on volume, weight and shipping method. For reference, this supplier’s average shipment value is $28,840. We provide a full costing including duties, VAT and broker fees as part of project management.
Can we pay as a legal entity?+
Yes. Payment by invoice for organizations — send your details and we'll issue an invoice. We work with any type of legal entity. Closing documents (act, offer agreement) are provided.
from $250/mo