🇰🇿
Kazakhstan Оцинк Import preparation

ТОО"АСПМК-519"

?About the companyShipment volume is declining toward the end of the period — worth checking current relevance.10 HS product groups in shipment history — a clear picture of the company's range.616 shipments on record — the basis for the reliability rating.

Supplier from Kazakhstan · г.Алматы.ул.Исаева-15.офис-88.Рес.Казахстан. 616 shipments over 2025, average price $18,349. Main product — iron or steel; articles, n.e.c. in chapter 73 (HS 7326909807). We'll prepare your import from this supplier — from analysis to contract.

Vedzilla is an import-preparation service: we help set up imports from this company to your country (CIS, Central Asia). Logistics and customs clearance are arranged by the importer.

Turnkey project management — from $250/mo
Free review · we reply during business hours
Shipments
616
rating
Period
2025–2025
of shipments
Average price
$18 349
per shipment
Total volume
$11 302 742
at least
Product groups: 7308909809·Structures of iron or steel and parts thereof; plates, rods, angles, shapes, sections, tubes and the like, prepared for use in structures 7326909807·Iron or steel; articles, n.e.c. in chapter 73 8535900008·Electrical apparatus for switching, protecting electrical circuits, for making connections to or in electrical circuits; for a voltage exceeding 1000 volts 7308200000·Structures of iron or steel and parts thereof; plates, rods, angles, shapes, sections, tubes and the like, prepared for use in structures 8546100000·Electrical insulators of any material 7614100000·Aluminium; stranded wire, cables, plaited bands and the like, (not electrically insulated) 7326909400·Iron or steel; articles, n.e.c. in chapter 73 8535400000·Electrical apparatus for switching, protecting electrical circuits, for making connections to or in electrical circuits; for a voltage exceeding 1000 volts

What ТОО"АСПМК-519" supplies

10 HS codes · prices from real shipments
HS codeGoodsShipmentsPrice, $ (min–max)
7326909807
Iron or steel; articles, n.e.c. in chapter 73
Проектирование, поставка и монтаж высоковольтных линий электропередачи 304 $8 – $40 301
7308200000
Structures of iron or steel and parts thereof; plates, rods, angles, shapes, sections, tubes and the like, prepared for use in structures
1. Стальные порталы ПС 220-Я3 оценк., Всего:1 комп. - вес: 5840 кг 2. 81 $3 853 – $243 174
7308909809
Structures of iron or steel and parts thereof; plates, rods, angles, shapes, sections, tubes and the like, prepared for use in structures
Стойка освещения СГКФ 10-3 70/158-Б оцинк.(фланец 370*370мм, межосевое 65 $88 – $132 739
8546100000
Electrical insulators of any material
Проектирование, поставка и монтаж высоковольтных линий электропередачи 60 $103 – $44 037
8535900008
Electrical apparatus for switching, protecting electrical circuits, for making connections to or in electrical circuits; for a voltage exceeding 1000 volts
1) Зажим соединительный САС-500-2 59шт.: вес: 196,47 кг; 2) Вид и кол 49 $7 – $10 496
7326909400
Iron or steel; articles, n.e.c. in chapter 73
1) Серьга СР-12-16 , 24 шт: вес: 7 кг; 2) Вид и количество упаковки:2 32 $19 – $972
8535400000
Electrical apparatus for switching, protecting electrical circuits, for making connections to or in electrical circuits; for a voltage exceeding 1000 volts
1) Рог разрядный РР-156 , 2 шт: вес: 1 кг; 2) Вид и количество упаковк 10 $3 – $105
7614100000
Aluminium; stranded wire, cables, plaited bands and the like, (not electrically insulated)
1) Сталеалюминиевый провод АС 500/64 17716км.: вес: 32810 кг; 2) Вид и 7 $116 155 – $170 609
and 2 more product groups · Request full range and pricing breakdown →
Turnkey import preparation
Monthly project management: supplier analysis, negotiations, delivery costing and contract preparation. You get a result, not disjointed services. Logistics and customs are not included.
from $250/mo
First review is free

How the project works

4 stages: analysis → negotiations → costing → contract
1
SHIPMENT ANALYSIS
⏱ 3 days

We analyze the supplier

“I want to know if this supplier is reliable — how much they ship, what volumes”

Shipments by monthrating
53
92
6
14
18
6
25
6
MayJunJulAugSepOctNovDec
Shipment trend and regularity
Product groups (HS codes) and prices
Conclusion: reliability and what to watch for
Included in the project
2
NEGOTIATIONS
⏱ 5 days

We send a request

“I want to start working with this supplier — are they open to negotiate?”

This is what a negotiation report looks likesample
Vedzilla → seller
Request for quotation. Delivery to your country. MOQ and prices?
seller reply (sample)
MOQ 200 pcs. Lead time 3–4 weeks. Ready to work with your region.
Main product per shipment data: Iron or steel; articles, n.e.c. in chapter 73 · HS codes 7326909807
Indicative price from shipments: $18 349
We'll request a quote, MOQ, lead time and readiness to ship to your country
Illustration of the format. We handle correspondence with the seller as part of the project — real answers will be in your report.
Included in the project
3
DELIVERY COST
⏱ 1 day

We calculate the full delivery cost

“I want to know how much delivery to us will cost”

Delivery cost → to youexample
Goods cost (EXW)$18 350
Freight to border+ $1 470
Duty + VAT on import+ $6 340
Broker fee+ $350
Total turnkey$26 510
Estimate for a typical batch (average shipment value — $18 349). Exact costing depends on your volume and terms.
Included in the project
4
CONTRACT
⏱ 2 days

We prepare the deal contract

“I've agreed terms with the seller — I need a proper contract”

Contract — sample structureRU / EN
INTERNATIONAL SALE AND PURCHASE AGREEMENT
«__» ________ 2026 г.
Seller: ТОО"АСПМК-519", Kazakhstan
Buyer: company “__________”, your country
Subject: Iron or steel; articles, n.e.c. in chapter 73 · HS codes 7326909807
Terms: Incoterms — to be agreed
Price · Arbitration · Force majeure · ███████████
Prepared for bank currency control
Bilingual contract
Sample structure. We tailor the contract to your specific deal.
Included in the project

Import preparation: what's included

We prepare your import from this supplier in Kazakhstan — iron or steel; articles, n.e.c. in chapter 73 (HS 7326909807): we vet the company against real shipments, negotiate in its language, calculate the full delivery cost to you (duty, VAT, freight to border) and prepare a foreign trade contract for your bank's currency control.

Other suppliers: Articles of iron or steel

FAQ

What do you know about the supplier ТОО"АСПМК-519"?+
Based on shipment data: 616 shipments over 2025, main product — Iron or steel; articles, n.e.c. in chapter 73, average shipment value — $18,349. A total of 10 HS product groups. The more confirmed shipments, the higher the reliability rating.
What does project management include?+
We analyse and vet this supplier (shipments, prices, rating), negotiate in their language, calculate the delivery cost to you, and prepare a contract suited to your bank. Logistics and customs clearance are not included.
How do negotiations with the supplier work?+
We send a quote request, including for “Iron or steel; articles, n.e.c. in chapter 73”, correspond in English and the supplier's language, clarify prices, minimum order quantity, lead times and willingness to work with your country. The result is a report with the supplier's answers.
How much does delivery from Kazakhstan cost?+
It depends on volume, weight and shipping method. For reference, this supplier’s average shipment value is $18,349. We provide a full costing including duties, VAT and broker fees as part of project management.
Can we pay as a legal entity?+
Yes. Payment by invoice for organizations — send your details and we'll issue an invoice. We work with any type of legal entity. Closing documents (act, offer agreement) are provided.
from $250/mo