🇨🇳 China Import preparation

SHENZHEN XINSENZEYAN CO., LTD

?About the companyShipment volume is declining toward the end of the period — worth checking current relevance.6 HS product groups in shipment history — a clear picture of the company's range.7 shipments on record — the basis for the reliability rating.

Supplier from China · Room 222, Building B, No. 133, Yinqing Road, Jiuting Town,. 7 shipments over 2026, average price $253. Main product — iron or steel; articles, n.e.c. in chapter 73 (HS 7326200009). We'll prepare your import from this supplier — from analysis to contract.

Vedzilla is an import-preparation service: we help set up imports from this company to your country (CIS, Central Asia). Logistics and customs clearance are arranged by the importer.

Turnkey project management — from $250/mo
Free review · we reply during business hours
Shipments
7
rating
Period
2026–2026
of shipments
Average price
$253
per shipment
Total volume
$1 770
at least
Product groups: 7308909809·Structures of iron or steel and parts thereof; plates, rods, angles, shapes, sections, tubes and the like, prepared for use in structures 7326200009·Iron or steel; articles, n.e.c. in chapter 73 7326909807 8451900000·Machinery (not of heading no. 8450) for washing, cleaning, wringing, drying, ironing, pressing, bleaching, dyeing, dressing, finishing, coating or impregnating textile yarn, fabrics or made up articles 8504409100·Electric transformers, static converters (e.g. rectifiers) and inductors 9026108900·Instruments, apparatus for measuring or checking the flow, level, pressure of liquids, gases (e.g. flow meters, heat meters etc), not instruments and apparatus of heading no. 9014, 9015, 9028 or 9032

What SHENZHEN XINSENZEYAN CO., LTD supplies

6 HS codes · prices from real shipments
HS codeGoodsShipmentsPrice, $ (min–max)
7326200009
Iron or steel; articles, n.e.c. in chapter 73
Stainless steel elbow, qty: 36 pcs. - 23.04 kg 1, 2 $20 – $180
7308909809
Structures of iron or steel and parts thereof; plates, rods, angles, shapes, sections, tubes and the like, prepared for use in structures
Stainless steel pipe (samples), qty: 19 pcs. - 23.18 kg 1, 1 $285 – $285
7326909807 Variable diameter stainless steel, qty: 3 pcs. - 23.25 kg 1, 1 $15 – $15
8451900000
Machinery (not of heading no. 8450) for washing, cleaning, wringing, drying, ironing, pressing, bleaching, dyeing, dressing, finishing, coating or impregnating textile yarn, fabrics or made up articles
Encoder material: plastic used for accessories. Made in China. 19.25 k 1 $8 – $8
8504409100
Electric transformers, static converters (e.g. rectifiers) and inductors
Frequency converter material - iron used for accessories. Made in Chin 1 $92 – $92
9026108900
Instruments, apparatus for measuring or checking the flow, level, pressure of liquids, gases (e.g. flow meters, heat meters etc), not instruments and apparatus of heading no. 9014, 9015, 9028 or 9032
Pressure transmitter Pressure range0-1 Mpa Accuracy0.2% FS Connection 1 $1 170 – $1 170
Turnkey import preparation
Monthly project management: supplier analysis, negotiations, delivery costing and contract preparation. You get a result, not disjointed services. Logistics and customs are not included.
from $250/mo
First review is free

How the project works

4 stages: analysis → negotiations → costing → contract
1
SHIPMENT ANALYSIS
⏱ 3 days

We analyze the supplier

“I want to know if this supplier is reliable — how much they ship, what volumes”

Shipments by monthrating
4
1
2
MarAprMay
Shipment trend and regularity
Product groups (HS codes) and prices
Conclusion: reliability and what to watch for
Included in the project
2
NEGOTIATIONS
⏱ 5 days

We send a request

“I want to start working with this supplier — are they open to negotiate?”

This is what a negotiation report looks likesample
Vedzilla → seller
Request for quotation. Delivery to your country. MOQ and prices?
seller reply (sample)
MOQ 200 pcs. Lead time 3–4 weeks. Ready to work with your region.
Main product per shipment data: Iron or steel; articles, n.e.c. in chapter 73 · HS codes 7326200009
Indicative price from shipments: $253
We'll request a quote, MOQ, lead time and readiness to ship to your country
Illustration of the format. We handle correspondence with the seller as part of the project — real answers will be in your report.
Included in the project
3
DELIVERY COST
⏱ 1 day

We calculate the full delivery cost

“I want to know how much delivery to us will cost”

Delivery cost → to youexample
Goods cost (EXW)$250
Freight to border+ $20
Duty + VAT on import+ $90
Broker fee+ $350
Total turnkey$710
Estimate for a typical batch (average shipment value — $253). Exact costing depends on your volume and terms.
Included in the project
4
CONTRACT
⏱ 2 days

We prepare the deal contract

“I've agreed terms with the seller — I need a proper contract”

Contract — sample structureRU / EN
INTERNATIONAL SALE AND PURCHASE AGREEMENT
«__» ________ 2026 г.
Seller: SHENZHEN XINSENZEYAN CO., LTD, China
Buyer: company “__________”, your country
Subject: Iron or steel; articles, n.e.c. in chapter 73 · HS codes 7326200009
Terms: Incoterms — to be agreed
Price · Arbitration · Force majeure · ███████████
Prepared for bank currency control
Bilingual contract
Sample structure. We tailor the contract to your specific deal.
Included in the project

Import preparation: what's included

We prepare your import from this supplier in China — iron or steel; articles, n.e.c. in chapter 73 (HS 7326200009): we vet the company against real shipments, negotiate in its language, calculate the full delivery cost to you (duty, VAT, freight to border) and prepare a foreign trade contract for your bank's currency control.

Other suppliers: Articles of iron or steel

FAQ

What do you know about the supplier SHENZHEN XINSENZEYAN CO., LTD?+
Based on shipment data: 7 shipments over 2026, main product — Iron or steel; articles, n.e.c. in chapter 73, average shipment value — $253. A total of 6 HS product groups. The more confirmed shipments, the higher the reliability rating.
What does project management include?+
We check the company against real shipments and prices, negotiate terms, calculate the full delivery cost and draw up a contract for your bank's currency control. Delivery and customs are handled separately.
How do negotiations with the supplier work?+
We send a quote request, including for “Iron or steel; articles, n.e.c. in chapter 73”, correspond in English and the supplier's language, clarify prices, minimum order quantity, lead times and willingness to work with your country. The result is a report with the supplier's answers.
How much does delivery from China cost?+
It depends on volume, weight and shipping method. For reference, this supplier’s average shipment value is $253. We provide a full costing including duties, VAT and broker fees as part of project management.
Can we pay as a legal entity?+
Yes, we issue an invoice for any type of legal entity — just send your details. Closing documents (act, offer agreement) are provided as well.
from $250/mo