🇨🇳
China Import preparation

Shandong Huayang Electric Power Company

?About the company37 HS product groups in shipment history — a clear picture of the company's range.86 shipments on record — the basis for the reliability rating.

Supplier from China · 1402-2, Lushang Furuida Plaza, No.988 Xinluo Street, High tech Zone, Jinan City, Shandong Province. 86 shipments over 2025, average price $461. Main product — structures of iron or steel and parts thereof; plates, rods, angles, shapes, sections, tubes and the like, prepared for use in structures (HS 7308300000). We'll prepare your import from this supplier — from analysis to contract.

Vedzilla is an import-preparation service: we help set up imports from this company to your country (CIS, Central Asia). Logistics and customs clearance are arranged by the importer.

Turnkey project management — from $250/mo
Free review · we reply during business hours
Shipments
86
rating
Period
2025–2025
of shipments
Average price
$461
per shipment
Total volume
$39 612
at least
Product groups: 3214900009·Glaziers' putty, grafting putty, resin cements, caulking compounds and other mastics; painters' fillings; non-refractory surfacing preparations for facades, indoor walls, floors, ceilings or the like 3506990000·Prepared glues and other prepared adhesives, n.e.c. or included; products suitable for use as glues or adhesives, put up for retail sale as glues or adhesives, not exceeding 1kg net weight 3816000000·Refractory cements, mortars, concretes and similar compositions, including dolomite ramming mix, other than products of heading 38.01 3917390008·Tubes, pipes and hoses and fittings thereof (for example, joints, elbows, flanges), of plastics 3925100000·Plastics; builders' wares n.e.c. or included 3925908009 3926909709·Articles of plastics and articles of other materials of heading no. 3901 to 3914, n.e.c. in chapter 39 7306900009·Iron or steel (excluding cast iron); tubes, pipes and hollow profiles (not seamless), n.e.c. in chapter 73

What Shandong Huayang Electric Power Company supplies

37 HS codes · prices from real shipments
HS codeGoodsShipmentsPrice, $ (min–max)
7308300000
Structures of iron or steel and parts thereof; plates, rods, angles, shapes, sections, tubes and the like, prepared for use in structures
1. Двери стальные из черных металов входные , новые, с каркасом в ком 16 $69 – $1 059
7307298000
Tube or pipe fittings (e.g. couplings, elbows, sleeves), of iron or steel
1. Прокатанный метал выплавленный из черных металлов*Фитинги для желез 15 $30 – $525
7326909807
Iron or steel; articles, n.e.c. in chapter 73
1. Изделия из металла* Зажим для закалки - кол. 1200 шт, вес: 10 кг 2. 8 $32 – $2 319
7307910000 1. Фланец переходной предназначен для прочного и герметичного соединен 4 $70 – $903
7318190008
Screws, bolts, nuts, coach screws, screw hooks, rivets, cotters, cotter-pins, washers (including spring washers) and similar articles, of iron or steel
1. U-образная монтажная скоба используется на промышленных предприяти 4 $62 – $764
8481806900
Taps, cocks, valves and similar appliances for pipes, boiler shells, tanks, vats or the like, including pressure-reducing valves and thermostatically controlled valves
1. Шиберная задвижка с выдвижным штоком и канавками для отопительной с 3 $105 – $580
3925908009
Plastics; builders' wares n.e.c. or included
1. Изделия из пластика*расширительная трубка держать гвозди в стене - 2 $24 – $351
7307199000 1. Фитинги с канавками и Муфта (также известная как Муфты с пазами) - 2 $14 – $74
and 29 more product groups · Request full range and pricing breakdown →
Turnkey import preparation
Monthly project management: supplier analysis, negotiations, delivery costing and contract preparation. You get a result, not disjointed services. Logistics and customs are not included.
from $250/mo
First review is free

How the project works

4 stages: analysis → negotiations → costing → contract
1
SHIPMENT ANALYSIS
⏱ 3 days

We analyze the supplier

“I want to know if this supplier is reliable — how much they ship, what volumes”

Shipments by monthrating
12
74
JanMar
Shipment trend and regularity
Product groups (HS codes) and prices
Conclusion: reliability and what to watch for
Included in the project
2
NEGOTIATIONS
⏱ 5 days

We send a request

“I want to start working with this supplier — are they open to negotiate?”

This is what a negotiation report looks likesample
Vedzilla → seller
Request for quotation. Delivery to your country. MOQ and prices?
seller reply (sample)
MOQ 200 pcs. Lead time 3–4 weeks. Ready to work with your region.
Main product per shipment data: Structures of iron or steel and parts thereof; plates, rods, angles, shapes, sections, tubes and the like, prepared for use in structures · HS codes 7308300000
Indicative price from shipments: $461
We'll request a quote, MOQ, lead time and readiness to ship to your country
Illustration of the format. We handle correspondence with the seller as part of the project — real answers will be in your report.
Included in the project
3
DELIVERY COST
⏱ 1 day

We calculate the full delivery cost

“I want to know how much delivery to us will cost”

Delivery cost → to youexample
Goods cost (EXW)$450
Freight to border+ $40
Duty + VAT on import+ $160
Broker fee+ $350
Total turnkey$1 000
Estimate for a typical batch (average shipment value — $461). Exact costing depends on your volume and terms.
Included in the project
4
CONTRACT
⏱ 2 days

We prepare the deal contract

“I've agreed terms with the seller — I need a proper contract”

Contract — sample structureRU / EN
INTERNATIONAL SALE AND PURCHASE AGREEMENT
«__» ________ 2026 г.
Seller: Shandong Huayang Electric Power Company, China
Buyer: company “__________”, your country
Subject: Structures of iron or steel and parts thereof; plates, rods, angles, shapes, sections, tubes and the like, prepared for use in structures · HS codes 7308300000
Terms: Incoterms — to be agreed
Price · Arbitration · Force majeure · ███████████
Prepared for bank currency control
Bilingual contract
Sample structure. We tailor the contract to your specific deal.
Included in the project

Import preparation: what's included

We prepare your import from this supplier in China — structures of iron or steel and parts thereof; plates, rods, angles, shapes, sections, tubes and the like, prepared for use in structures (HS 7308300000): we vet the company against real shipments, negotiate in its language, calculate the full delivery cost to you (duty, VAT, freight to border) and prepare a foreign trade contract for your bank's currency control.

FAQ

What do you know about the supplier Shandong Huayang Electric Power Company?+
Based on shipment data: 86 shipments over 2025, main product — Structures of iron or steel and parts thereof; plates, rods, angles, shapes, sections, tubes and the like, prepared for use in structures, average shipment value — $461. A total of 37 HS product groups. The more confirmed shipments, the higher the reliability rating.
What does project management include?+
We take care of vetting the supplier, negotiating terms and price, costing delivery to you, and preparing a bilingual contract for your bank. Logistics and customs clearance are not part of this.
How do negotiations with the supplier work?+
We send a quote request, including for “Structures of iron or steel and parts thereof; plates, rods, angles, shapes, sections, tubes and the like, prepared for use in structures”, correspond in English and the supplier's language, clarify prices, minimum order quantity, lead times and willingness to work with your country. The result is a report with the supplier's answers.
How much does delivery from China cost?+
It depends on volume, weight and shipping method. For reference, this supplier’s average shipment value is $461. We provide a full costing including duties, VAT and broker fees as part of project management.
Can we pay as a legal entity?+
Yes. We accept payment by invoice from any legal entity — we just need your details. Closing documents (act, offer agreement) are issued on our side.
from $250/mo