🇨🇳 China Semenova Data up to date

KASHGAR SANGHE INDUSTRY AND TRADE CO.,LTD

?About the companyShipment volume is declining toward the end of the period — worth checking current relevance.20 HS product groups in shipment history — a clear picture of the company's range.66 shipments on record — the basis for the reliability rating.

Supplier from China · NO.E-5-72 COMPREHENSIVE BONDED ZONE, XINJIANG PRODUCTION ANG CONSTRUCTION CORPSSUB-REGION. KASHGAR. 66 shipments over 2025–2026, average price $11,966. Main product — iron or steel; articles, n.e.c. in chapter 73 (HS 7326909807). Free vetting and similar suppliers after registration. One-off services for this supplier: contract preparation or deal support — from $120.

Vedzilla is an import-preparation service: we help set up imports from this company to your country (CIS, Central Asia). Logistics and customs clearance are arranged by the importer.

We reply during business hours
Show data
Leave your email — no password, no payment. Opens exact figures and full lists across the site right away.
Shipments
66
rating
Period
2025–2026
years
Average price
$11 966
per shipment
Total volume
$789 727
at least
Product groups: 7326909807·Iron or steel; articles, n.e.c. in chapter 73 3824995000·Prepared binders for foundry moulds or cores; chemical products and preparations of the chemical or allied industries (including those consisting of mixtures of natural products), not elsewhere specified or included 8454900000·Converters, ladles, ingot moulds and casting machines; of a kind used metallurgy or in metal foundries 7616991002·Aluminium; articles n.e.c. in chapter 76 6813200009·Friction material and articles thereof (e.g. sheets, rolls, strips, segments, discs, washers, pads) not mounted; for brakes, clutches or the like, with a basis of asbestos, other mineral substances, or cellulose 7322190000·Radiators for central heating, not electrically heated and parts thereof, of iron or steel; air heaters, hot air distributors not electrically heated, with motor fan or blower 8403909000·Central heating boilers; excluding those of heading no. 8402 2804690000

What KAS… supplies

20 HS codes · prices from real shipments
HS codeGoodsShipmentsPrice, $ (min–max)
7326909807 Steel heat-conducting duct, used in the production of aluminum radiato 31 $308 – $19 830
3824995000 Electrodeposited Coating (Anodic Electrodeposited Coating AED-2000, AE 8 $12 100 – $24 000
8454900000 Aluminum Radiator Production Line (Pressing Machine Hour, Spare Parts 5 $500 – $1 910
7616991002 Semi-finished radiator (unpainted, not assembled) packed on a pallet a 3 $680 – $19 612
6813200009 ASBESTOS GASKET (the cargo is intended for personal use and is used in 2 $36 – $138
7322190000 Spare parts for steel radiator (side and top covers) kg 7 2 $1 302 – $3 260
8403909000 For boiler Water tank Water tank pipe Proportional valve Sealing tape 2 $30 560 – $32 144
2804690000 КРЕМНИЙ, ИСПОЛЬЗУЕТСЯ В ПРОИЗОДСТВЕ АЛЮМИНИЕВЫХ РАДИАТОРОВ (СЧИТАЕТСЯ 1 $6 720 – $6 720
and 12 more product groups · Unlock range, volumes and prices →
Vetting conclusion
Shipments recorded in 2026.
Main product: Iron or steel; articles, n.e.c. in chapter 73 (HS 7326909807)
66 confirmed shipments
Deal support
We request quotes from the supplier, negotiate price and lead times, and cost the import. If needed — a bilingual contract for your bank. Logistics and customs are not included.
from $250
Timeline — per project

Our services

One-off services, no commitment — order what you need now
1 Contract preparation
per project
Bilingual contract with the supplier: delivery terms, payment, deadlines, liability, dispute handling.
from $120 Order
2 Deal support
per project
Requesting quotes, comparing terms, negotiating price and lead times, delivery cost calculation.
from $250 Order

Other suppliers: Articles of iron or steel

FAQ

What do you know about the supplier KAS…?+
Based on shipment data: 66 shipments over 2025–2026, main product — Iron or steel; articles, n.e.c. in chapter 73, average shipment value — $11,966. A total of 20 HS product groups. The more confirmed shipments, the higher the reliability rating.
What does deal support include?+
We request quotes from the supplier, compare terms, negotiate price and lead times, and cost the delivery to you in full. Logistics and customs clearance are not included; contract preparation is a separate service.
How do negotiations with the supplier work?+
We send a quote request, including for “Iron or steel; articles, n.e.c. in chapter 73”, correspond in English and the supplier's language, clarify prices, minimum order quantity, lead times and willingness to work with your country. The result is a report with the supplier's answers.
How much does delivery from China cost?+
It depends on volume, weight and shipping method. For reference, this supplier’s average shipment value is $11,966. We provide a full costing including duties, VAT and broker fees as part of project management.
Can we pay as a legal entity?+
Yes. We accept payment by invoice from any legal entity — we just need your details. Closing documents (act, offer agreement) are issued on our side.
from $120