🇨🇳
China Import preparation

ZHONGSHAN CHANGHONG ELECRIC CO,.LTD

?About the company7 HS product groups in shipment history — a clear picture of the company's range.42 shipments on record — the basis for the reliability rating.

Supplier from China · CHINA. 42 shipments over 2026, average price $1,226. Main product — copper tubes and pipes (HS 7411290000). We'll prepare your import from this supplier — from analysis to contract.

Vedzilla is an import-preparation service: we help set up imports from this company to your country (CIS, Central Asia). Logistics and customs clearance are arranged by the importer.

Turnkey project management — from $250/mo
Free review · we reply during business hours
Shipments
42
rating
Period
2026–2026
of shipments
Average price
$1 226
per shipment
Total volume
$51 495
at least
Product groups: 8415900009·Air conditioning machines; comprising a motor driven fan and elements for changing the temperature and humidity, including those machines in which the humidity cannot be separately regulated 8414308107·Air or vacuum pumps, air or other gas compressors and fans; ventilating or recycling hoods incorporating a fan; gas-tight biological safety cabinets whether or not fitted with filters 4016930005·Articles of vulcanised rubber other than hard rubber, n.e.c. in chapter 40 7318165000·Screws, bolts, nuts, coach screws, screw hooks, rivets, cotters, cotter-pins, washers (including spring washers) and similar articles, of iron or steel 7411290000·Copper tubes and pipes 8481807399·Taps, cocks, valves and similar appliances for pipes, boiler shells, tanks, vats or the like, including pressure-reducing valves and thermostatically controlled valves 7318141100·Screws, bolts, nuts, coach screws, screw hooks, rivets, cotters, cotter-pins, washers (including spring washers) and similar articles, of iron or steel

What ZHONGSHAN CHANGHONG ELECRIC CO,.LTD supplies

7 HS codes · prices from real shipments
HS codeGoodsShipmentsPrice, $ (min–max)
7411290000
Copper tubes and pipes
Pipeline assembly Connecting pipe (single) ?9?0.6?3000 Pure copper/PE 18 $19 – $21 840
8481807399
Taps, cocks, valves and similar appliances for pipes, boiler shells, tanks, vats or the like, including pressure-reducing valves and thermostatically controlled valves
Capillary assembly TP2Y ?5?D2?800*2+TP2Y ?5?D3?400 Globe valve assembl 6 $0 – $2 566
8415900009
Air conditioning machines; comprising a motor driven fan and elements for changing the temperature and humidity, including those machines in which the humidity cannot be separately regulated
Front plate assembly. Material: galvanized steel + plastic. Size: 660* 6 $290 – $2 409
4016930005
Articles of vulcanised rubber other than hard rubber, n.e.c. in chapter 40
Rubber foot damping rubber pad. Hardness HS40?5. Color black. Spare pa 6 $0 – $201
7318165000
Screws, bolts, nuts, coach screws, screw hooks, rivets, cotters, cotter-pins, washers (including spring washers) and similar articles, of iron or steel
Nut M5 Nut M5 * 0.8 * 5 spare parts for the production of air conditio 3 $0 – $519
8414308107
Air or vacuum pumps, air or other gas compressors and fans; ventilating or recycling hoods incorporating a fan; gas-tight biological safety cabinets whether or not fitted with filters
Compressor Inverter Refrigerant R32/R410A Power voltage 220 V Power fr 2 $529 – $3 479
7318141100
Screws, bolts, nuts, coach screws, screw hooks, rivets, cotters, cotter-pins, washers (including spring washers) and similar articles, of iron or steel
Screw with washer Material steel Size GB90712-88 M5X5 Color Silver-whi 1 $26 – $26
Turnkey import preparation
Monthly project management: supplier analysis, negotiations, delivery costing and contract preparation. You get a result, not disjointed services. Logistics and customs are not included.
from $250/mo
First review is free

How the project works

4 stages: analysis → negotiations → costing → contract
1
SHIPMENT ANALYSIS
⏱ 3 days

We analyze the supplier

“I want to know if this supplier is reliable — how much they ship, what volumes”

Shipments by monthrating
42
May
Shipment trend and regularity
Product groups (HS codes) and prices
Conclusion: reliability and what to watch for
Included in the project
2
NEGOTIATIONS
⏱ 5 days

We send a request

“I want to start working with this supplier — are they open to negotiate?”

This is what a negotiation report looks likesample
Vedzilla → seller
Request for quotation. Delivery to your country. MOQ and prices?
seller reply (sample)
MOQ 200 pcs. Lead time 3–4 weeks. Ready to work with your region.
Main product per shipment data: Copper tubes and pipes · HS codes 7411290000
Indicative price from shipments: $1 226
We'll request a quote, MOQ, lead time and readiness to ship to your country
Illustration of the format. We handle correspondence with the seller as part of the project — real answers will be in your report.
Included in the project
3
DELIVERY COST
⏱ 1 day

We calculate the full delivery cost

“I want to know how much delivery to us will cost”

Delivery cost → to youexample
Goods cost (EXW)$1 250
Freight to border+ $100
Duty + VAT on import+ $430
Broker fee+ $350
Total turnkey$2 130
Estimate for a typical batch (average shipment value — $1 226). Exact costing depends on your volume and terms.
Included in the project
4
CONTRACT
⏱ 2 days

We prepare the deal contract

“I've agreed terms with the seller — I need a proper contract”

Contract — sample structureRU / EN
INTERNATIONAL SALE AND PURCHASE AGREEMENT
«__» ________ 2026 г.
Seller: ZHONGSHAN CHANGHONG ELECRIC CO,.LTD, China
Buyer: company “__________”, your country
Subject: Copper tubes and pipes · HS codes 7411290000
Terms: Incoterms — to be agreed
Price · Arbitration · Force majeure · ███████████
Prepared for bank currency control
Bilingual contract
Sample structure. We tailor the contract to your specific deal.
Included in the project

Import preparation: what's included

We prepare your import from this supplier in China — copper tubes and pipes (HS 7411290000): we vet the company against real shipments, negotiate in its language, calculate the full delivery cost to you (duty, VAT, freight to border) and prepare a foreign trade contract for your bank's currency control.

Other suppliers: Copper

FAQ

What do you know about the supplier ZHONGSHAN CHANGHONG ELECRIC CO,.LTD?+
Based on shipment data: 42 shipments over 2026, main product — Copper tubes and pipes, average shipment value — $1,226. A total of 7 HS product groups. The more confirmed shipments, the higher the reliability rating.
What does project management include?+
We analyse and vet this supplier (shipments, prices, rating), negotiate in their language, calculate the delivery cost to you, and prepare a contract suited to your bank. Logistics and customs clearance are not included.
How do negotiations with the supplier work?+
We send a quote request, including for “Copper tubes and pipes”, correspond in English and the supplier's language, clarify prices, minimum order quantity, lead times and willingness to work with your country. The result is a report with the supplier's answers.
How much does delivery from China cost?+
It depends on volume, weight and shipping method. For reference, this supplier’s average shipment value is $1,226. We provide a full costing including duties, VAT and broker fees as part of project management.
Can we pay as a legal entity?+
Yes. Payment by invoice for organizations — send your details and we'll issue an invoice. We work with any type of legal entity. Closing documents (act, offer agreement) are provided.
from $250/mo