🇨🇳 China Import preparation

Yolanda Import & Export (Suzhou) Co., Ltd

?About the company4 HS product groups in shipment history — a clear picture of the company's range.5 shipments on record — the basis for the reliability rating.

Supplier from China · 810-196, Zhiyuan International Business Building, No. 101 Kefa Road, High-tech Zone, Suzhou,. 5 shipments over 2026, average price $295. Main product — taps, cocks, valves and similar appliances for pipes, boiler shells, tanks, vats or the like, including pressure-reducing valves and thermostatically controlled valves (HS 8481809907). We'll prepare your import from this supplier — from analysis to contract.

Vedzilla is an import-preparation service: we help set up imports from this company to your country (CIS, Central Asia). Logistics and customs clearance are arranged by the importer.

Turnkey project management — from $250/mo
Free review · we reply during business hours
Shipments
5
rating
Period
2026–2026
of shipments
Average price
$295
per shipment
Total volume
$1 477
at least
Product groups: 7304410008·Tubes, pipes and hollow profiles, seamless, of iron (other than cast iron) or steel 7307291000·Tube or pipe fittings (e.g. couplings, elbows, sleeves), of iron or steel 7307298000 8481809907·Taps, cocks, valves and similar appliances for pipes, boiler shells, tanks, vats or the like, including pressure-reducing valves and thermostatically controlled valves

What Yolanda Import & Export (Suzhou) Co., Ltd supplies

4 HS codes · prices from real shipments
HS codeGoodsShipmentsPrice, $ (min–max)
8481809907
Taps, cocks, valves and similar appliances for pipes, boiler shells, tanks, vats or the like, including pressure-reducing valves and thermostatically controlled valves
316L Stainless Steel 12" NPT Female x 12" NPT Male 2-Way Directional C 2 $82 – $626
7304410008
Tubes, pipes and hollow profiles, seamless, of iron (other than cast iron) or steel
S16-ST-MT12-2 Seamless cold-formed pipe made of stainless steel AISI 3 1 $395 – $395
7307291000
Tube or pipe fittings (e.g. couplings, elbows, sleeves), of iron or steel
SS-MT12-MN8 316L stainless steel adapter for connecting 12mm diameter 1 $264 – $264
7307298000 SS-UT-MT12 316L Stainless Steel Tee with Compression Fittings for Pipe 1 $111 – $111
Turnkey import preparation
Monthly project management: supplier analysis, negotiations, delivery costing and contract preparation. You get a result, not disjointed services. Logistics and customs are not included.
from $250/mo
First review is free

How the project works

4 stages: analysis → negotiations → costing → contract
1
SHIPMENT ANALYSIS
⏱ 3 days

We analyze the supplier

“I want to know if this supplier is reliable — how much they ship, what volumes”

Shipments by monthrating
5
Feb
Shipment trend and regularity
Product groups (HS codes) and prices
Conclusion: reliability and what to watch for
Included in the project
2
NEGOTIATIONS
⏱ 5 days

We send a request

“I want to start working with this supplier — are they open to negotiate?”

This is what a negotiation report looks likesample
Vedzilla → seller
Request for quotation. Delivery to your country. MOQ and prices?
seller reply (sample)
MOQ 200 pcs. Lead time 3–4 weeks. Ready to work with your region.
Main product per shipment data: Taps, cocks, valves and similar appliances for pipes, boiler shells, tanks, vats or the like, including pressure-reducing valves and thermostatically controlled valves · HS codes 8481809907
Indicative price from shipments: $295
We'll request a quote, MOQ, lead time and readiness to ship to your country
Illustration of the format. We handle correspondence with the seller as part of the project — real answers will be in your report.
Included in the project
3
DELIVERY COST
⏱ 1 day

We calculate the full delivery cost

“I want to know how much delivery to us will cost”

Delivery cost → to youexample
Goods cost (EXW)$300
Freight to border+ $20
Duty + VAT on import+ $100
Broker fee+ $350
Total turnkey$770
Estimate for a typical batch (average shipment value — $295). Exact costing depends on your volume and terms.
Included in the project
4
CONTRACT
⏱ 2 days

We prepare the deal contract

“I've agreed terms with the seller — I need a proper contract”

Contract — sample structureRU / EN
INTERNATIONAL SALE AND PURCHASE AGREEMENT
«__» ________ 2026 г.
Seller: Yolanda Import & Export (Suzhou) Co., Ltd, China
Buyer: company “__________”, your country
Subject: Taps, cocks, valves and similar appliances for pipes, boiler shells, tanks, vats or the like, including pressure-reducing valves and thermostatically controlled valves · HS codes 8481809907
Terms: Incoterms — to be agreed
Price · Arbitration · Force majeure · ███████████
Prepared for bank currency control
Bilingual contract
Sample structure. We tailor the contract to your specific deal.
Included in the project

Import preparation: what's included

We prepare your import from this supplier in China — taps, cocks, valves and similar appliances for pipes, boiler shells, tanks, vats or the like, including pressure-reducing valves and thermostatically controlled valves (HS 8481809907): we vet the company against real shipments, negotiate in its language, calculate the full delivery cost to you (duty, VAT, freight to border) and prepare a foreign trade contract for your bank's currency control.

FAQ

What do you know about the supplier Yolanda Import & Export (Suzhou) Co., Ltd?+
Based on shipment data: 5 shipments over 2026, main product — Taps, cocks, valves and similar appliances for pipes, boiler shells, tanks, vats or the like, including pressure-reducing valves and thermostatically controlled valves, average shipment value — $295. A total of 4 HS product groups. The more confirmed shipments, the higher the reliability rating.
What does project management include?+
From vetting to signature: we review shipments and pricing, negotiate in the supplier's language, cost the delivery in full and prepare the contract. Logistics and customs clearance stay on your side.
How do negotiations with the supplier work?+
We send a quote request, including for “Taps, cocks, valves and similar appliances for pipes, boiler shells, tanks, vats or the like, including pressure-reducing valves and thermostatically controlled valves”, correspond in English and the supplier's language, clarify prices, minimum order quantity, lead times and willingness to work with your country. The result is a report with the supplier's answers.
How much does delivery from China cost?+
It depends on volume, weight and shipping method. For reference, this supplier’s average shipment value is $295. We provide a full costing including duties, VAT and broker fees as part of project management.
Can we pay as a legal entity?+
Yes, we issue an invoice for any type of legal entity — just send your details. Closing documents (act, offer agreement) are provided as well.
from $250/mo