🇨🇳
China HUANSHENG Import preparation

The IT Electronics Eleventh Design&Research Institute Scientific and Technological Engineering Corpo

?About the companyShipment volume is declining toward the end of the period — worth checking current relevance.9 HS product groups in shipment history — a clear picture of the company's range.26 shipments on record — the basis for the reliability rating.

Supplier from China · No. 251, Shuanglin Road, Chenghua District, Chengdu City, Sichuan Province. 26 shipments over 2025, average price $207,500. Main product — structures of iron or steel and parts thereof; plates, rods, angles, shapes, sections, tubes and the like, prepared for use in structures (HS 7308909809). We'll prepare your import from this supplier — from analysis to contract.

Vedzilla is an import-preparation service: we help set up imports from this company to your country (CIS, Central Asia). Logistics and customs clearance are arranged by the importer.

Turnkey project management — from $250/mo
Free review · we reply during business hours
Shipments
26
rating
Period
2025–2025
of shipments
Average price
$207 500
per shipment
Total volume
$5 394 993
at least
Product groups: 8431390000·Machinery parts; used solely or principally with the machinery of heading no. 8425 to 8430 8541430000·Semiconductor devices (e.g. diodes, transistors, semiconductor based transducers); including photovoltaic cells assembled or not in modules or panels, light-emitting diodes (LED) assembled with other LEDs or not, mounted piezo-electric crystals 8487909000·Machinery parts; not containing electrical connectors, insulators, coils, contacts or other electrical features, n.e.c. in this chapter 7308909809·Structures of iron or steel and parts thereof; plates, rods, angles, shapes, sections, tubes and the like, prepared for use in structures 5607509000·Twine, cordage, ropes and cables, whether or not plaited or braided; whether or not impregnated, coated, covered or sheathed with rubber or plastics 8428908000·Lifting, handling, loading or unloading machinery; n.e.c. in heading no. 8425, 8426 or 8427 (e.g. lifts, escalators, conveyors, teleferics) 9406901000·Buildings; prefabricated 8430100000·Moving, grading, levelling, scraping, excavating, tamping, compacting, extracting or boring machinery, for earth, minerals, or ores; pile drivers and extractors; snow ploughs and snow blowers

What The IT Electronics Eleventh Design&Research Institute Scientific and Technological Engineering Corpo supplies

9 HS codes · prices from real shipments
HS codeGoodsShipmentsPrice, $ (min–max)
7308909809
Structures of iron or steel and parts thereof; plates, rods, angles, shapes, sections, tubes and the like, prepared for use in structures
1. Steel pipe spiural pile - кол. 1064 шт., вес: 26620 кг 2. мест 56, 7 $3 274 – $648 454
8487909000
Machinery parts; not containing electrical connectors, insulators, coils, contacts or other electrical features, n.e.c. in this chapter
1. Steel pipe spiral pile 95*4 - кол. 1064 шт., вес: 27520 кг 2. мест 6 $16 484 – $891 827
8431390000
Machinery parts; used solely or principally with the machinery of heading no. 8425 to 8430
1. High strength polyester / Высокопрочный полиэстер - кол. 10 шт., ве 5 $625 – $35 000
8541430000
Semiconductor devices (e.g. diodes, transistors, semiconductor based transducers); including photovoltaic cells assembled or not in modules or panels, light-emitting diodes (LED) assembled with other LEDs or not, mounted piezo-electric crystals
1. Photovoltaic modules/ Фотоэлектрические модули System Voltage 660 3 $52 516 – $382 613
9406901000
Buildings; prefabricated
1. Folding room комплектующие части солнечного паанеля - кол. 15 шт., 1 $2 083 – $2 083
8431498009
Machinery parts; used solely or principally with the machinery of heading no. 8425 to 8430
1. Комплектующие PD10 pile driver Hydraulic oil - кол. 4 шт., вес: 600 1 $400 – $400
8430100000
Moving, grading, levelling, scraping, excavating, tamping, compacting, extracting or boring machinery, for earth, minerals, or ores; pile drivers and extractors; snow ploughs and snow blowers
1. PD10 pile driver accessories Hydraulic oil - кол. 1 шт, вес: 7122 к 1 $420 706 – $420 706
8428908000
Lifting, handling, loading or unloading machinery; n.e.c. in heading no. 8425, 8426 or 8427 (e.g. lifts, escalators, conveyors, teleferics)
1. Three -wheel pay-off pulley - кол. 180 шт, вес: 14680 кг 2. мест 18 1 $10 000 – $10 000
and 1 more product groups · Request full range and pricing breakdown →
Turnkey import preparation
Monthly project management: supplier analysis, negotiations, delivery costing and contract preparation. You get a result, not disjointed services. Logistics and customs are not included.
from $250/mo
First review is free

How the project works

4 stages: analysis → negotiations → costing → contract
1
SHIPMENT ANALYSIS
⏱ 3 days

We analyze the supplier

“I want to know if this supplier is reliable — how much they ship, what volumes”

Shipments by monthrating
7
12
6
1
FebMarAugNov
Shipment trend and regularity
Product groups (HS codes) and prices
Conclusion: reliability and what to watch for
Included in the project
2
NEGOTIATIONS
⏱ 5 days

We send a request

“I want to start working with this supplier — are they open to negotiate?”

This is what a negotiation report looks likesample
Vedzilla → seller
Request for quotation. Delivery to your country. MOQ and prices?
seller reply (sample)
MOQ 200 pcs. Lead time 3–4 weeks. Ready to work with your region.
Main product per shipment data: Structures of iron or steel and parts thereof; plates, rods, angles, shapes, sections, tubes and the like, prepared for use in structures · HS codes 7308909809
Indicative price from shipments: $207 500
We'll request a quote, MOQ, lead time and readiness to ship to your country
Illustration of the format. We handle correspondence with the seller as part of the project — real answers will be in your report.
Included in the project
3
DELIVERY COST
⏱ 1 day

We calculate the full delivery cost

“I want to know how much delivery to us will cost”

Delivery cost → to youexample
Goods cost (EXW)$207 500
Freight to border+ $16 600
Duty + VAT on import+ $71 710
Broker fee+ $350
Total turnkey$296 160
Estimate for a typical batch (average shipment value — $207 500). Exact costing depends on your volume and terms.
Included in the project
4
CONTRACT
⏱ 2 days

We prepare the deal contract

“I've agreed terms with the seller — I need a proper contract”

Contract — sample structureRU / EN
INTERNATIONAL SALE AND PURCHASE AGREEMENT
«__» ________ 2026 г.
Seller: The IT Electronics Eleventh Design&Research Institute Scientific and Technological Engineering Corpo, China
Buyer: company “__________”, your country
Subject: Structures of iron or steel and parts thereof; plates, rods, angles, shapes, sections, tubes and the like, prepared for use in structures · HS codes 7308909809
Terms: Incoterms — to be agreed
Price · Arbitration · Force majeure · ███████████
Prepared for bank currency control
Bilingual: Russian + English
Sample structure. We tailor the contract to your specific deal.
Included in the project

Import preparation: what's included

We prepare your import from this supplier in China — structures of iron or steel and parts thereof; plates, rods, angles, shapes, sections, tubes and the like, prepared for use in structures (HS 7308909809): we vet the company against real shipments, negotiate in its language, calculate the full delivery cost to you (duty, VAT, freight to border) and prepare a foreign trade contract for your bank's currency control.

FAQ

What do you know about the supplier The IT Electronics Eleventh Design&Research Institute Scientific and Technological Engineering Corpo?+
Based on shipment data: 26 shipments over 2025, main product — Structures of iron or steel and parts thereof; plates, rods, angles, shapes, sections, tubes and the like, prepared for use in structures, average shipment value — $207,500. A total of 9 HS product groups. The more confirmed shipments, the higher the reliability rating.
What does project management include?+
We analyse and vet this supplier (shipments, prices, rating), negotiate in their language, calculate the delivery cost to you, and prepare a contract suited to your bank. Logistics and customs clearance are not included.
How do negotiations with the supplier work?+
We send a quote request, including for “Structures of iron or steel and parts thereof; plates, rods, angles, shapes, sections, tubes and the like, prepared for use in structures”, correspond in English and the supplier's language, clarify prices, minimum order quantity, lead times and willingness to work with your country. The result is a report with the supplier's answers.
How much does delivery from China cost?+
It depends on volume, weight and shipping method. For reference, this supplier’s average shipment value is $207,500. We provide a full costing including duties, VAT and broker fees as part of project management.
Can we pay as a legal entity?+
Yes. Payment by invoice for organizations — send your details and we'll issue an invoice. We work with any type of legal entity. Closing documents (act, offer agreement) are provided.
from $250/mo