🇨🇳 China HILTI Data up to date

SEPCOIII ELECTRIC POWER CONSTRUCTION CO.,LTD.

?About the companyShipment volume is declining toward the end of the period — worth checking current relevance.173 HS product groups in shipment history — a clear picture of the company's range.4029 shipments on record — the basis for the reliability rating.

Supplier from China · 882-1 Tong'an Road, Laoshan District, Qingdao, Shandong 266100. 4029 shipments over 2025–2026, average price $148,593. Main product — machinery, plant (not domestic), or laboratory equipment; electrically heated or not, (excluding items in 85.14) for the treatment of materials by a process involving change of temperature; including instantaneous or non electric storage water heaters (HS 8419500009). Free vetting and similar suppliers after registration. One-off services for this supplier: contract preparation or deal support — from $120.

Vedzilla is an import-preparation service: we help set up imports from this company to your country (CIS, Central Asia). Logistics and customs clearance are arranged by the importer.

We reply during business hours
Show data
Leave your email — no password, no payment. Opens exact figures and full lists across the site right away.
Shipments
4029
rating
Period
2025–2026
years
Average price
$148 593
per shipment
Total volume
$598 235 664
at least
Product groups: 8419500009·Machinery, plant (not domestic), or laboratory equipment; electrically heated or not, (excluding items in 85.14) for the treatment of materials by a process involving change of temperature; including instantaneous or non electric storage water heaters 8402199000·Boilers; steam or other vapour generating (other than central heating hot water boilers, capable also of producing low pressure steam), super heated water boilers 7308909809·Structures of iron or steel and parts thereof; plates, rods, angles, shapes, sections, tubes and the like, prepared for use in structures 8411828009·Turbo-jets, turbo-propellers and other gas turbines 8414805909·Air or vacuum pumps, air or other gas compressors and fans; ventilating or recycling hoods incorporating a fan; gas-tight biological safety cabinets whether or not fitted with filters 8544499108·Insulated wire, cable and other electric conductors, connector fitted or not; optical fibre cables of individually sheathed fibres, whether or not assembled with electric conductors or fitted with connectors 8544499501 8426110000·Derricks, cranes, including cable cranes, mobile lifting frames, straddle carriers and works trucks fitted with a crane

What SEP… supplies

173 HS codes · prices from real shipments
HS codeGoodsShipmentsPrice, $ (min–max)
8419500009 Components of equipment included in a 1500-1600 MW combined cycle powe 860 $6 560 – $2 705 921
8402199000 Components of equipment included in a 1500-1600 MW combined cycle powe 682 $2 302 – $1 961 746
7308909809 Components for equipment included in a 1500-1600 MW combined cycle pow 530 $109 – $471 052
8411828009 Disassembled components of equipment included in a 1500-1600 MW combin 293 $126 – $2 053 288
8414805909 Components of the equipment included in the combined cycle power plant 120 $15 420 – $3 912 628
8544499108 Copper control cable with cross-linked polyethylene (XLPE) insulation, 111 $1 265 – $837 450
8544499501 Pair cable: CU.PVC.IS.OS.PVC.FR-300.500V pair cable. Cable length: 7,5 92 $1 298 – $100 923
8426110000 Components of the equipment that is part of the combined SURKHANDARYA 64 $561 – $214 120
and 165 more product groups · Unlock range, volumes and prices →
Vetting conclusion
Shipments recorded in 2026.
Main product: Machinery, plant (not domestic), or laboratory … (HS 8419500009)
4029 confirmed shipments
Deal support
We request quotes from the supplier, negotiate price and lead times, and cost the import. If needed — a bilingual contract for your bank. Logistics and customs are not included.
from $250
Timeline — per project

Our services

One-off services, no commitment — order what you need now
1 Contract preparation
per project
Bilingual contract with the supplier: delivery terms, payment, deadlines, liability, dispute handling.
from $120 Order
2 Deal support
per project
Requesting quotes, comparing terms, negotiating price and lead times, delivery cost calculation.
from $250 Order

FAQ

What do you know about the supplier SEP…?+
Based on shipment data: 4029 shipments over 2025–2026, main product — Machinery, plant (not domestic), or laboratory equipment; electrically heated or not, (excluding items in 85.14) for the treatment of materials by a process involving change of temperature; including instantaneous or non electric storage water heaters, average shipment value — $148,593. A total of 173 HS product groups. The more confirmed shipments, the higher the reliability rating.
What does deal support include?+
Requesting quotes, comparing terms across options, negotiating price and lead times, full delivery costing. Logistics, customs clearance and the contract are separate.
How do negotiations with the supplier work?+
We send a quote request, including for “Machinery, plant (not domestic), or laboratory equipment; electrically heated or not, (excluding items in 85.14) for the treatment of materials by a process involving change of temperature; including instantaneous or non electric storage water heaters”, correspond in English and the supplier's language, clarify prices, minimum order quantity, lead times and willingness to work with your country. The result is a report with the supplier's answers.
How much does delivery from China cost?+
It depends on volume, weight and shipping method. For reference, this supplier’s average shipment value is $148,593. We provide a full costing including duties, VAT and broker fees as part of project management.
Can we pay as a legal entity?+
Yes. We accept payment by invoice from any legal entity — we just need your details. Closing documents (act, offer agreement) are issued on our side.
from $120