🇹🇷
Turkey DAYAN Import preparation

RIVER METAL SANAYI TICARET LIMITED SIRKETI

?About the companyShipments are growing — recent months show higher volumes than the start of the period.5 HS product groups in shipment history — a clear picture of the company's range.13 shipments on record — the basis for the reliability rating.

Supplier from Turkey · ORHAN GAZI MAH. 2.YOL SK. ISISO SAN. SIT B BLOK 6, ESENYURT/034/ ISTANBUL. 13 shipments over 2025, average price $3,826. Main product — copper; tube or pipe fittings (e.g. couplings, elbows, sleeves) (HS 7412200000). We'll prepare your import from this supplier — from analysis to contract.

Vedzilla is an import-preparation service: we help set up imports from this company to your country (CIS, Central Asia). Logistics and customs clearance are arranged by the importer.

Turnkey project management — from $250/mo
Free review · we reply during business hours
Shipments
13
rating
Period
2025–2025
of shipments
Average price
$3 826
per shipment
Total volume
$49 735
at least
Product groups: 8481803900·Taps, cocks, valves and similar appliances for pipes, boiler shells, tanks, vats or the like, including pressure-reducing valves and thermostatically controlled valves 8481801900·Taps, cocks, valves and similar appliances for pipes, boiler shells, tanks, vats or the like, including pressure-reducing valves and thermostatically controlled valves 7412200000·Copper; tube or pipe fittings (e.g. couplings, elbows, sleeves) 8481309908·Taps, cocks, valves and similar appliances for pipes, boiler shells, tanks, vats or the like, including pressure-reducing valves and thermostatically controlled valves 8421210009·Centrifuges, including centrifugal dryers; filtering or purifying machinery and apparatus for liquids or gases

What RIVER METAL SANAYI TICARET LIMITED SIRKETI supplies

5 HS codes · prices from real shipments
HS codeGoodsShipmentsPrice, $ (min–max)
7412200000
Copper; tube or pipe fittings (e.g. couplings, elbows, sleeves)
1. Угловая ракор из латуни 1/2. Марка DAYAN. Кол-во 700 шт. Вес нетто 4 $280 – $1 596
8481803900
Taps, cocks, valves and similar appliances for pipes, boiler shells, tanks, vats or the like, including pressure-reducing valves and thermostatically controlled valves
1. Коллектор для теплого пола / Kendinen vanali kollektor. Диаметр 16 3 $10 569 – $10 675
8481801900
Taps, cocks, valves and similar appliances for pipes, boiler shells, tanks, vats or the like, including pressure-reducing valves and thermostatically controlled valves
1. Кран для радиатора 1/2. Марка DAYAN. Кол-во 6432 шт. Вес нетто 1540 2 $5 146 – $5 146
8481309908
Taps, cocks, valves and similar appliances for pipes, boiler shells, tanks, vats or the like, including pressure-reducing valves and thermostatically controlled valves
1. Обратный клапан из латуни 1. Марка DAYAN. Кол-во 1160 шт. Вес нетто 2 $487 – $487
8421210009
Centrifuges, including centrifugal dryers; filtering or purifying machinery and apparatus for liquids or gases
1. Фильтр для воды из латуни 1/2. Марка DAYAN. Кол-во 1210 шт. Вес нет 2 $1 452 – $1 452
Turnkey import preparation
Monthly project management: supplier analysis, negotiations, delivery costing and contract preparation. You get a result, not disjointed services. Logistics and customs are not included.
from $250/mo
First review is free

How the project works

4 stages: analysis → negotiations → costing → contract
1
SHIPMENT ANALYSIS
⏱ 3 days

We analyze the supplier

“I want to know if this supplier is reliable — how much they ship, what volumes”

Shipments by monthrating
1
2
10
JanMayJul
Shipment trend and regularity
Product groups (HS codes) and prices
Conclusion: reliability and what to watch for
Included in the project
2
NEGOTIATIONS
⏱ 5 days

We send a request

“I want to start working with this supplier — are they open to negotiate?”

This is what a negotiation report looks likesample
Vedzilla → seller
Request for quotation. Delivery to your country. MOQ and prices?
seller reply (sample)
MOQ 200 pcs. Lead time 3–4 weeks. Ready to work with your region.
Main product per shipment data: Copper; tube or pipe fittings (e.g. couplings, elbows, sleeves) · HS codes 7412200000
Indicative price from shipments: $3 826
We'll request a quote, MOQ, lead time and readiness to ship to your country
Illustration of the format. We handle correspondence with the seller as part of the project — real answers will be in your report.
Included in the project
3
DELIVERY COST
⏱ 1 day

We calculate the full delivery cost

“I want to know how much delivery to us will cost”

Delivery cost → to youexample
Goods cost (EXW)$3 850
Freight to border+ $310
Duty + VAT on import+ $1 330
Broker fee+ $350
Total turnkey$5 840
Estimate for a typical batch (average shipment value — $3 826). Exact costing depends on your volume and terms.
Included in the project
4
CONTRACT
⏱ 2 days

We prepare the deal contract

“I've agreed terms with the seller — I need a proper contract”

Contract — sample structureRU / EN
INTERNATIONAL SALE AND PURCHASE AGREEMENT
«__» ________ 2026 г.
Seller: RIVER METAL SANAYI TICARET LIMITED SIRKETI, Turkey
Buyer: company “__________”, your country
Subject: Copper; tube or pipe fittings (e.g. couplings, elbows, sleeves) · HS codes 7412200000
Terms: Incoterms — to be agreed
Price · Arbitration · Force majeure · ███████████
Prepared for bank currency control
Bilingual: Russian + English
Sample structure. We tailor the contract to your specific deal.
Included in the project

Import preparation: what's included

We prepare your import from this supplier in Turkey — copper; tube or pipe fittings (e.g. couplings, elbows, sleeves) (HS 7412200000): we vet the company against real shipments, negotiate in its language, calculate the full delivery cost to you (duty, VAT, freight to border) and prepare a foreign trade contract for your bank's currency control.

FAQ

What do you know about the supplier RIVER METAL SANAYI TICARET LIMITED SIRKETI?+
Based on shipment data: 13 shipments over 2025, main product — Copper; tube or pipe fittings (e.g. couplings, elbows, sleeves), average shipment value — $3,826. A total of 5 HS product groups. The more confirmed shipments, the higher the reliability rating.
What does project management include?+
We analyse and vet this supplier (shipments, prices, rating), negotiate in their language, calculate the delivery cost to you, and prepare a contract suited to your bank. Logistics and customs clearance are not included.
How do negotiations with the supplier work?+
We send a quote request, including for “Copper; tube or pipe fittings (e.g. couplings, elbows, sleeves)”, correspond in English and the supplier's language, clarify prices, minimum order quantity, lead times and willingness to work with your country. The result is a report with the supplier's answers.
How much does delivery from Turkey cost?+
It depends on volume, weight and shipping method. For reference, this supplier’s average shipment value is $3,826. We provide a full costing including duties, VAT and broker fees as part of project management.
Can we pay as a legal entity?+
Yes. Payment by invoice for organizations — send your details and we'll issue an invoice. We work with any type of legal entity. Closing documents (act, offer agreement) are provided.
from $250/mo