🇨🇳 China NUCLEUS Import preparation

NUCLEUS (QINGDAO) ENERGY TECHNOLOGY CO. LIMITED

?About the company10 HS product groups in shipment history — a clear picture of the company's range.23 shipments on record — the basis for the reliability rating.

Supplier from China · ROOM 502 No.5 BEISHAN RD LICANG DISTRICT QINGDAO. 23 shipments over 2026, average price $244. Main product — tube or pipe fittings (e.g. couplings, elbows, sleeves), of iron or steel (HS 7307929000). We'll prepare your import from this supplier — from analysis to contract.

Vedzilla is an import-preparation service: we help set up imports from this company to your country (CIS, Central Asia). Logistics and customs clearance are arranged by the importer.

Turnkey project management — from $250/mo
Free review · we reply during business hours
Shipments
23
rating
Period
2026–2026
of shipments
Average price
$244
per shipment
Total volume
$5 619
at least
Product groups: 4009420009·Tubes, pipes and hoses, of vulcanised rubber (other than hard rubber), with or without their fittings (e.g. joints, elbows, flanges) 4016930005·Articles of vulcanised rubber other than hard rubber, n.e.c. in chapter 40 7307921000·Tube or pipe fittings (e.g. couplings, elbows, sleeves), of iron or steel 7307929000 7307991000 7315119000·Chain and parts thereof, of iron or steel 7315190000 8205598099·Tools, hand; (including glaziers' diamonds) n.e.c.; blow lamps; vices, clamps etc, other than accessories for and parts of, machine-tools or water-jet cutting machines; anvils; portable forges; hand or pedal operated grinding wheels with frameworks

What NUCLEUS (QINGDAO) ENERGY TECHNOLOGY CO. LIMITED supplies

10 HS codes · prices from real shipments
HS codeGoodsShipmentsPrice, $ (min–max)
7307929000
Tube or pipe fittings (e.g. couplings, elbows, sleeves), of iron or steel
Safety clamps & wire rope, etc. - for 2" irons 2. 8 pieces 3. DFSU6889 5 $111 – $166
7307921000 Crossover (2-3/8" EUE pin - 2-7/8" EUE box) AOL: 30cm, 2. 2 pieces 3. 4 $38 – $87
7307991000 2'' FIG1502 M&F hammer union, thread / Quick-release coupling (QRC) 2. 4 $32 – $161
4016930005
Articles of vulcanised rubber other than hard rubber, n.e.c. in chapter 40
4" rubber seal or o-ring for FIG 206 2000psi hammer union. - 0.2 kg 2. 2 $10 – $27
7315119000
Chain and parts thereof, of iron or steel
Diamond 120 duplex chain / Double-row drive roller chain, ANSI size 12 2 $321 – $491
7315190000 Semi-lock for item (Diamond 120 duplex chain) / Connecting link (semi- 2 $6 – $8
4009420009
Tubes, pipes and hoses, of vulcanised rubber (other than hard rubber), with or without their fittings (e.g. joints, elbows, flanges)
2'' x 5000psi 30ft - High Pressure Hose (Connection: 2'' 2. 4 pieces 3 1 $893 – $893
8205598099
Tools, hand; (including glaziers' diamonds) n.e.c.; blow lamps; vices, clamps etc, other than accessories for and parts of, machine-tools or water-jet cutting machines; anvils; portable forges; hand or pedal operated grinding wheels with frameworks
Tensioning device for installing chains / Manual device for installing 1 $169 – $169
and 2 more product groups · Request full range and pricing breakdown →
Turnkey import preparation
Monthly project management: supplier analysis, negotiations, delivery costing and contract preparation. You get a result, not disjointed services. Logistics and customs are not included.
from $250/mo
First review is free

How the project works

4 stages: analysis → negotiations → costing → contract
1
SHIPMENT ANALYSIS
⏱ 3 days

We analyze the supplier

“I want to know if this supplier is reliable — how much they ship, what volumes”

Shipments by monthrating
23
Mar
Shipment trend and regularity
Product groups (HS codes) and prices
Conclusion: reliability and what to watch for
Included in the project
2
NEGOTIATIONS
⏱ 5 days

We send a request

“I want to start working with this supplier — are they open to negotiate?”

This is what a negotiation report looks likesample
Vedzilla → seller
Request for quotation. Delivery to your country. MOQ and prices?
seller reply (sample)
MOQ 200 pcs. Lead time 3–4 weeks. Ready to work with your region.
Main product per shipment data: Tube or pipe fittings (e.g. couplings, elbows, sleeves), of iron or steel · HS codes 7307929000
Indicative price from shipments: $244
We'll request a quote, MOQ, lead time and readiness to ship to your country
Illustration of the format. We handle correspondence with the seller as part of the project — real answers will be in your report.
Included in the project
3
DELIVERY COST
⏱ 1 day

We calculate the full delivery cost

“I want to know how much delivery to us will cost”

Delivery cost → to youexample
Goods cost (EXW)$250
Freight to border+ $20
Duty + VAT on import+ $90
Broker fee+ $350
Total turnkey$710
Estimate for a typical batch (average shipment value — $244). Exact costing depends on your volume and terms.
Included in the project
4
CONTRACT
⏱ 2 days

We prepare the deal contract

“I've agreed terms with the seller — I need a proper contract”

Contract — sample structureRU / EN
INTERNATIONAL SALE AND PURCHASE AGREEMENT
«__» ________ 2026 г.
Seller: NUCLEUS (QINGDAO) ENERGY TECHNOLOGY CO. LIMITED, China
Buyer: company “__________”, your country
Subject: Tube or pipe fittings (e.g. couplings, elbows, sleeves), of iron or steel · HS codes 7307929000
Terms: Incoterms — to be agreed
Price · Arbitration · Force majeure · ███████████
Prepared for bank currency control
Bilingual contract
Sample structure. We tailor the contract to your specific deal.
Included in the project

Import preparation: what's included

We prepare your import from this supplier in China — tube or pipe fittings (e.g. couplings, elbows, sleeves), of iron or steel (HS 7307929000): we vet the company against real shipments, negotiate in its language, calculate the full delivery cost to you (duty, VAT, freight to border) and prepare a foreign trade contract for your bank's currency control.

FAQ

What do you know about the supplier NUCLEUS (QINGDAO) ENERGY TECHNOLOGY CO. LIMITED?+
Based on shipment data: 23 shipments over 2026, main product — Tube or pipe fittings (e.g. couplings, elbows, sleeves), of iron or steel, average shipment value — $244. A total of 10 HS product groups. The more confirmed shipments, the higher the reliability rating.
What does project management include?+
We take care of vetting the supplier, negotiating terms and price, costing delivery to you, and preparing a bilingual contract for your bank. Logistics and customs clearance are not part of this.
How do negotiations with the supplier work?+
We send a quote request, including for “Tube or pipe fittings (e.g. couplings, elbows, sleeves), of iron or steel”, correspond in English and the supplier's language, clarify prices, minimum order quantity, lead times and willingness to work with your country. The result is a report with the supplier's answers.
How much does delivery from China cost?+
It depends on volume, weight and shipping method. For reference, this supplier’s average shipment value is $244. We provide a full costing including duties, VAT and broker fees as part of project management.
Can we pay as a legal entity?+
Yes, we issue an invoice for any type of legal entity — just send your details. Closing documents (act, offer agreement) are provided as well.
from $250/mo