🇹🇷
Turkey MBT Import preparation

Mitsubishi Corporation

?About the companyShipment volume is declining toward the end of the period — worth checking current relevance.375 HS product groups in shipment history — a clear picture of the company's range.4015 shipments on record — the basis for the reliability rating.

Supplier from Turkey · 3-1, Marunouchi 2-Chome, Chiyoda-ku, Tokyo. 100-8086. Japan. 4015 shipments over 2025–2026, average price $82,813. Main product — screws, bolts, nuts, coach screws, screw hooks, rivets, cotters, cotter-pins, washers (including spring washers) and similar articles, of iron or steel (HS 7318159008). We'll prepare your import from this supplier — from analysis to contract.

Vedzilla is an import-preparation service: we help set up imports from this company to your country (CIS, Central Asia). Logistics and customs clearance are arranged by the importer.

Turnkey project management — from $250/mo
Free review · we reply during business hours
Shipments
4015
rating
Period
2025–2026
of shipments
Average price
$82 813
per shipment
Total volume
$332 492 340
at least
Product groups: 8536699000·Electrical apparatus for switching, protecting electrical circuits, for making connections to or in electrical circuits, for a voltage not exceeding 1000 volts; connectors for optical fibres, optical fibre bundles or cables 8419500009·Machinery, plant (not domestic), or laboratory equipment; electrically heated or not, (excluding items in 85.14) for the treatment of materials by a process involving change of temperature; including instantaneous or non electric storage water heaters 8544499900·Insulated wire, cable and other electric conductors, connector fitted or not; optical fibre cables of individually sheathed fibres, whether or not assembled with electric conductors or fitted with connectors 8421210009·Centrifuges, including centrifugal dryers; filtering or purifying machinery and apparatus for liquids or gases 8471500000·Automatic data processing machines and units thereof, magnetic or optical readers, machines for transcribing data onto data media in coded form and machines for processing such data, not elsewhere specified or included 8544499108·Insulated wire, cable and other electric conductors, connector fitted or not; optical fibre cables of individually sheathed fibres, whether or not assembled with electric conductors or fitted with connectors 8546200000·Electrical insulators of any material 2710198800·HS heading 2710

What Mitsubishi Corporation supplies

375 HS codes · prices from real shipments
HS codeGoodsShipmentsPrice, $ (min–max)
7318159008
Screws, bolts, nuts, coach screws, screw hooks, rivets, cotters, cotter-pins, washers (including spring washers) and similar articles, of iron or steel
Miscellaneous Bolt Nut Washer. Other fasteners (bolts, nuts, washers) 245 $20 – $335 916
7308909809
Structures of iron or steel and parts thereof; plates, rods, angles, shapes, sections, tubes and the like, prepared for use in structures
SANDWICH PANEL / Sandwich panels (Roof panel, WT Wall panel) kg 12, 12 199 $1 731 – $574 752
7326909807
Iron or steel; articles, n.e.c. in chapter 73
EMT Conduits / EMT Cable Ducts - 1 set () - Weight: 1,751 kg 102 193 $7 – $287 617
8411990098
Turbo-jets, turbo-propellers and other gas turbines
Fuel Gas Buffer Piping Tanks / Buffer tanks/tanks for fuel for fuel ga 183 $85 – $1 679 421
7305310000
Iron or steel (excluding cast iron); tubes and pipes (e.g. welded, riveted or similarly closed), having circular cross-sections, external diameter of which exceeds 406.4mm, not seamless
Stainless Steel Pipes. Stainless Steel Pipes - 1 set () - Turnkey (PP 170 $811 – $163 923
8484100009
Gaskets and similar joints of metal sheeting combined with other material or of two or more layers of metal; sets or assortments of gaskets and similar joints, dissimilar in composition, put up in pouches, envelopes or similar packings; mechanical seals
Miscellaneous Bolts & Nuts / Miscellaneous Bolts and Nuts (Gaskets) - 135 $1 – $154 315
7308200000
Structures of iron or steel and parts thereof; plates, rods, angles, shapes, sections, tubes and the like, prepared for use in structures
Galvanized Steel Structure for 220 kV Transformer Post Insulator. 1 se 130 $896 – $117 976
8419908509
Machinery, plant (not domestic), or laboratory equipment; electrically heated or not, (excluding items in 85.14) for the treatment of materials by a process involving change of temperature; including instantaneous or non electric storage water heaters
Heating Equipment Components / Heating Equipment Components - 1 set Co 124 $218 – $807 952
and 367 more product groups · Request full range and pricing breakdown →
Turnkey import preparation
Monthly project management: supplier analysis, negotiations, delivery costing and contract preparation. You get a result, not disjointed services. Logistics and customs are not included.
from $250/mo
First review is free

How the project works

4 stages: analysis → negotiations → costing → contract
1
SHIPMENT ANALYSIS
⏱ 3 days

We analyze the supplier

“I want to know if this supplier is reliable — how much they ship, what volumes”

Shipments by monthrating
150
214
301
404
193
670
470
103
OctNovDecJanFebMarAprMay
Shipment trend and regularity
Product groups (HS codes) and prices
Conclusion: reliability and what to watch for
Included in the project
2
NEGOTIATIONS
⏱ 5 days

We send a request

“I want to start working with this supplier — are they open to negotiate?”

This is what a negotiation report looks likesample
Vedzilla → seller
Request for quotation. Delivery to your country. MOQ and prices?
seller reply (sample)
MOQ 200 pcs. Lead time 3–4 weeks. Ready to work with your region.
Main product per shipment data: Screws, bolts, nuts, coach screws, screw hooks, rivets, cotters, cotter-pins, washers (including spring washers) and similar articles, of iron or steel · HS codes 7318159008
Indicative price from shipments: $82 813
We'll request a quote, MOQ, lead time and readiness to ship to your country
Illustration of the format. We handle correspondence with the seller as part of the project — real answers will be in your report.
Included in the project
3
DELIVERY COST
⏱ 1 day

We calculate the full delivery cost

“I want to know how much delivery to us will cost”

Delivery cost → to youexample
Goods cost (EXW)$82 800
Freight to border+ $6 620
Duty + VAT on import+ $28 610
Broker fee+ $350
Total turnkey$118 380
Estimate for a typical batch (average shipment value — $82 813). Exact costing depends on your volume and terms.
Included in the project
4
CONTRACT
⏱ 2 days

We prepare the deal contract

“I've agreed terms with the seller — I need a proper contract”

Contract — sample structureRU / EN
INTERNATIONAL SALE AND PURCHASE AGREEMENT
«__» ________ 2026 г.
Seller: Mitsubishi Corporation, Turkey
Buyer: company “__________”, your country
Subject: Screws, bolts, nuts, coach screws, screw hooks, rivets, cotters, cotter-pins, washers (including spring washers) and similar articles, of iron or steel · HS codes 7318159008
Terms: CIP
Price · Arbitration · Force majeure · ███████████
Prepared for bank currency control
Bilingual contract
Sample structure. We tailor the contract to your specific deal.
Included in the project

Import preparation: what's included

We prepare your import from this supplier in Turkey — screws, bolts, nuts, coach screws, screw hooks, rivets, cotters, cotter-pins, washers (including spring washers) and similar articles, of iron or steel (HS 7318159008): we vet the company against real shipments, negotiate in its language, calculate the full delivery cost to you (duty, VAT, freight to border) and prepare a foreign trade contract for your bank's currency control.

FAQ

What do you know about the supplier Mitsubishi Corporation?+
Based on shipment data: 4015 shipments over 2025–2026, main product — Screws, bolts, nuts, coach screws, screw hooks, rivets, cotters, cotter-pins, washers (including spring washers) and similar articles, of iron or steel, average shipment value — $82,813. A total of 375 HS product groups. The more confirmed shipments, the higher the reliability rating.
What does project management include?+
We analyse and vet this supplier (shipments, prices, rating), negotiate in their language, calculate the delivery cost to you, and prepare a contract suited to your bank. Logistics and customs clearance are not included.
How do negotiations with the supplier work?+
We send a quote request, including for “Screws, bolts, nuts, coach screws, screw hooks, rivets, cotters, cotter-pins, washers (including spring washers) and similar articles, of iron or steel”, correspond in English and the supplier's language, clarify prices, minimum order quantity, lead times and willingness to work with your country. The result is a report with the supplier's answers.
How much does delivery from Turkey cost?+
It depends on volume, weight and shipping method. For reference, this supplier’s average shipment value is $82,813. We provide a full costing including duties, VAT and broker fees as part of project management.
Can we pay as a legal entity?+
Yes. Payment by invoice for organizations — send your details and we'll issue an invoice. We work with any type of legal entity. Closing documents (act, offer agreement) are provided.
from $250/mo