🇰🇷
South Korea Import preparation

LG Electronics Inc.

?About the companyShipments are growing — recent months show higher volumes than the start of the period.15 HS product groups in shipment history — a clear picture of the company's range.179 shipments on record — the basis for the reliability rating.

Supplier from South Korea · 128.Yeoui-daero.Yeongdeungpo-gu.Seoul.Republic of Korea. 179 shipments over 2025–2026, average price $23,930. Main product — air conditioning machines; comprising a motor driven fan and elements for changing the temperature and humidity, including those machines in which the humidity cannot be separately regulated (HS 8415900009). We'll prepare your import from this supplier — from analysis to contract.

Vedzilla is an import-preparation service: we help set up imports from this company to your country (CIS, Central Asia). Logistics and customs clearance are arranged by the importer.

Turnkey project management — from $250/mo
Free review · we reply during business hours
Shipments
179
rating
Period
2025–2026
of shipments
Average price
$23 930
per shipment
Total volume
$4 283 401
at least
Product groups: 3926909709·Articles of plastics and articles of other materials of heading no. 3901 to 3914, n.e.c. in chapter 39 8529906500·Transmission apparatus; parts suitable for use solely or principally with the apparatus of heading no. 8524 to 8528 8527290000·Reception apparatus for radio-broadcasting, whether or not combined, in the same housing, with sound recording or reproducing apparatus or a clock. 8415900009·Air conditioning machines; comprising a motor driven fan and elements for changing the temperature and humidity, including those machines in which the humidity cannot be separately regulated 8481805990·Taps, cocks, valves and similar appliances for pipes, boiler shells, tanks, vats or the like, including pressure-reducing valves and thermostatically controlled valves 8537109809·Boards, panels, consoles, desks, cabinets, bases with apparatus of heading no. 8535, 8536 for electricity control and distribution, (other than switching apparatus of heading no. 8517) 8415810099·Air conditioning machines; comprising a motor driven fan and elements for changing the temperature and humidity, including those machines in which the humidity cannot be separately regulated 8537109801·Boards, panels, consoles, desks, cabinets, bases with apparatus of heading no. 8535, 8536 for electricity control and distribution, (other than switching apparatus of heading no. 8517)

What LG Electronics Inc. supplies

15 HS codes · prices from real shipments
HS codeGoodsShipmentsPrice, $ (min–max)
8415900009
Air conditioning machines; comprising a motor driven fan and elements for changing the temperature and humidity, including those machines in which the humidity cannot be separately regulated
Outdoor unit ARUM120LTEEWGBLEU, 1 unit - 215 kg 2026. Cooling capacit 62 $56 – $17 000
8415810099
Air conditioning machines; comprising a motor driven fan and elements for changing the temperature and humidity, including those machines in which the humidity cannot be separately regulated
ARUM240LTE6 - 2 pcs. Outdoor unit LG MULTI VI VRF air conditioning sys 56 $2 016 – $74 686
8415109000
Air conditioning machines; comprising a motor driven fan and elements for changing the temperature and humidity, including those machines in which the humidity cannot be separately regulated
1. ARUM080LTE5 Наружный блок для контроля влажности и температуры Мощ 15 $341 – $33 220
8415810090
Air conditioning machines; comprising a motor driven fan and elements for changing the temperature and humidity, including those machines in which the humidity cannot be separately regulated
1. ARUM120LTE5 Наружный блок LG MULTI V 5 для контроля влажности и тем 11 $549 – $25 816
8537109809
Boards, panels, consoles, desks, cabinets, bases with apparatus of heading no. 8535, 8536 for electricity control and distribution, (other than switching apparatus of heading no. 8517)
Wired remote control for air conditioning systems. Wired controller PR 7 $252 – $2 500
8529906500
Transmission apparatus; parts suitable for use solely or principally with the apparatus of heading no. 8524 to 8528
AM Production Parts: Model: Tracker/Onix : SWITCH ASM - RDO ASM - AM/F 6 $185 – $350 434
3926909709
Articles of plastics and articles of other materials of heading no. 3901 to 3914, n.e.c. in chapter 39
AM production parts: Model: Tracker/Onix : BRACKET-ASM RDO Radio Brack 6 $671 – $19 040
8527290000
Reception apparatus for radio-broadcasting, whether or not combined, in the same housing, with sound recording or reproducing apparatus or a clock.
AM production parts: Model: Tracker/Onix: RADIO ASM - RCVR ECCN techni 5 $276 733 – $553 467
and 7 more product groups · Request full range and pricing breakdown →
Turnkey import preparation
Monthly project management: supplier analysis, negotiations, delivery costing and contract preparation. You get a result, not disjointed services. Logistics and customs are not included.
from $250/mo
First review is free

How the project works

4 stages: analysis → negotiations → costing → contract
1
SHIPMENT ANALYSIS
⏱ 3 days

We analyze the supplier

“I want to know if this supplier is reliable — how much they ship, what volumes”

Shipments by monthrating
7
5
2
28
30
9
6
9
AugSepNovJanFebMarAprMay
Shipment trend and regularity
Product groups (HS codes) and prices
Conclusion: reliability and what to watch for
Included in the project
2
NEGOTIATIONS
⏱ 5 days

We send a request

“I want to start working with this supplier — are they open to negotiate?”

This is what a negotiation report looks likesample
Vedzilla → seller
Request for quotation. Delivery to your country. MOQ and prices?
seller reply (sample)
MOQ 200 pcs. Lead time 3–4 weeks. Ready to work with your region.
Main product per shipment data: Air conditioning machines; comprising a motor driven fan and elements for changing the temperature and humidity, including those machines in which the humidity cannot be separately regulated · HS codes 8415900009
Indicative price from shipments: $23 930
We'll request a quote, MOQ, lead time and readiness to ship to your country
Illustration of the format. We handle correspondence with the seller as part of the project — real answers will be in your report.
Included in the project
3
DELIVERY COST
⏱ 1 day

We calculate the full delivery cost

“I want to know how much delivery to us will cost”

Delivery cost → to youexample
Goods cost (EXW)$23 950
Freight to border+ $1 920
Duty + VAT on import+ $8 280
Broker fee+ $350
Total turnkey$34 500
Estimate for a typical batch (average shipment value — $23 930). Exact costing depends on your volume and terms.
Included in the project
4
CONTRACT
⏱ 2 days

We prepare the deal contract

“I've agreed terms with the seller — I need a proper contract”

Contract — sample structureRU / EN
INTERNATIONAL SALE AND PURCHASE AGREEMENT
«__» ________ 2026 г.
Seller: LG Electronics Inc., South Korea
Buyer: company “__________”, your country
Subject: Air conditioning machines; comprising a motor driven fan and elements for changing the temperature and humidity, including those machines in which the humidity cannot be separately regulated · HS codes 8415900009
Terms: FCA
Price · Arbitration · Force majeure · ███████████
Prepared for bank currency control
Bilingual: Russian + English
Sample structure. We tailor the contract to your specific deal.
Included in the project

Import preparation: what's included

We prepare your import from this supplier in South Korea — air conditioning machines; comprising a motor driven fan and elements for changing the temperature and humidity, including those machines in which the humidity cannot be separately regulated (HS 8415900009): we vet the company against real shipments, negotiate in its language, calculate the full delivery cost to you (duty, VAT, freight to border) and prepare a foreign trade contract for your bank's currency control.

FAQ

What do you know about the supplier LG Electronics Inc.?+
Based on shipment data: 179 shipments over 2025–2026, main product — Air conditioning machines; comprising a motor driven fan and elements for changing the temperature and humidity, including those machines in which the humidity cannot be separately regulated, average shipment value — $23,930. A total of 15 HS product groups. The more confirmed shipments, the higher the reliability rating.
What does project management include?+
We analyse and vet this supplier (shipments, prices, rating), negotiate in their language, calculate the delivery cost to you, and prepare a contract suited to your bank. Logistics and customs clearance are not included.
How do negotiations with the supplier work?+
We send a quote request, including for “Air conditioning machines; comprising a motor driven fan and elements for changing the temperature and humidity, including those machines in which the humidity cannot be separately regulated”, correspond in English and the supplier's language, clarify prices, minimum order quantity, lead times and willingness to work with your country. The result is a report with the supplier's answers.
How much does delivery from South Korea cost?+
It depends on volume, weight and shipping method. For reference, this supplier’s average shipment value is $23,930. We provide a full costing including duties, VAT and broker fees as part of project management.
Can we pay as a legal entity?+
Yes. Payment by invoice for organizations — send your details and we'll issue an invoice. We work with any type of legal entity. Closing documents (act, offer agreement) are provided.
from $250/mo