🇩🇪
Germany Airbus Operations Import preparation

KIT FACTORY GATE 24

?About the company10 HS product groups in shipment history — a clear picture of the company's range.19 shipments on record — the basis for the reliability rating.

Supplier from Germany · AM GENTER UFER 9 21129 HAMBURG. 19 shipments over 2025, average price $318. Main product — articles of plastics and articles of other materials of heading no. 3901 to 3914, n.e.c. in chapter 39 (HS 3926909706). We'll prepare your import from this supplier — from analysis to contract.

Vedzilla is an import-preparation service: we help set up imports from this company to your country (CIS, Central Asia). Logistics and customs clearance are arranged by the importer.

Turnkey project management — from $250/mo
Free review · we reply during business hours
Shipments
19
rating
Period
2025–2025
of shipments
Average price
$318
per shipment
Total volume
$6 040
at least
Product groups: 3926909706·Articles of plastics and articles of other materials of heading no. 3901 to 3914, n.e.c. in chapter 39 7318163001·Screws, bolts, nuts, coach screws, screw hooks, rivets, cotters, cotter-pins, washers (including spring washers) and similar articles, of iron or steel 7318220002 7318220008 8310000000·Sign plates, name plates, address plates and similar plates, numbers, letters and other symbols, of base metal, excluding those of heading no. 9405 8536201007·Electrical apparatus for switching, protecting electrical circuits, for making connections to or in electrical circuits, for a voltage not exceeding 1000 volts; connectors for optical fibres, optical fibre bundles or cables 8536411000 8536699000

What KIT FACTORY GATE 24 supplies

10 HS codes · prices from real shipments
HS codeGoodsShipmentsPrice, $ (min–max)
3926909706
Articles of plastics and articles of other materials of heading no. 3901 to 3914, n.e.c. in chapter 39
1. Идентификатор-этикетка / LABEL p/n: NSA937901E6 - 2 шт. для гражд 7 $26 – $1 060
7318220008
Screws, bolts, nuts, coach screws, screw hooks, rivets, cotters, cotter-pins, washers (including spring washers) and similar articles, of iron or steel
1. Металлическая шайба / WASHER p/n: 21-253-472 - 4 шт. для гражданс 3 $119 – $715
8310000000
Sign plates, name plates, address plates and similar plates, numbers, letters and other symbols, of base metal, excluding those of heading no. 9405
1. Информационная табличка / PLACARD p/n: D11313727A00 - 2 шт. для г 2 $60 – $60
7318163001 1. Гаечный соединитель / NUT p/n: MS21042-04 - 12 шт. для гражданско 1 $127 – $127
7318220002 1. Гаечное соединение / NUT p/n: EN6113AN02 - 4 шт. для гражданско а 1 $119 – $119
8536201007
Electrical apparatus for switching, protecting electrical circuits, for making connections to or in electrical circuits, for a voltage not exceeding 1000 volts; connectors for optical fibres, optical fibre bundles or cables
1. Автоматический выключатель электрической цепи / CB p/n: EN2996-004A 1 $116 – $116
8536411000 1. Коммутационное реле переменного тока / RELAY p/n: E0672D28A0 - 4шт. 1 $42 – $42
8536699000 1. Модуль-терминал / MODULE p/n: NSA937901M20-09 - 4 шт. для гражданск 1 $42 – $42
and 2 more product groups · Request full range and pricing breakdown →
Turnkey import preparation
Monthly project management: supplier analysis, negotiations, delivery costing and contract preparation. You get a result, not disjointed services. Logistics and customs are not included.
from $250/mo
First review is free

How the project works

4 stages: analysis → negotiations → costing → contract
1
SHIPMENT ANALYSIS
⏱ 3 days

We analyze the supplier

“I want to know if this supplier is reliable — how much they ship, what volumes”

Shipments by monthrating
19
Mar
Shipment trend and regularity
Product groups (HS codes) and prices
Conclusion: reliability and what to watch for
Included in the project
2
NEGOTIATIONS
⏱ 5 days

We send a request

“I want to start working with this supplier — are they open to negotiate?”

This is what a negotiation report looks likesample
Vedzilla → seller
Request for quotation. Delivery to your country. MOQ and prices?
seller reply (sample)
MOQ 200 pcs. Lead time 3–4 weeks. Ready to work with your region.
Main product per shipment data: Articles of plastics and articles of other materials of heading no. 3901 to 3914, n.e.c. in chapter 39 · HS codes 3926909706
Indicative price from shipments: $318
We'll request a quote, MOQ, lead time and readiness to ship to your country
Illustration of the format. We handle correspondence with the seller as part of the project — real answers will be in your report.
Included in the project
3
DELIVERY COST
⏱ 1 day

We calculate the full delivery cost

“I want to know how much delivery to us will cost”

Delivery cost → to youexample
Goods cost (EXW)$300
Freight to border+ $20
Duty + VAT on import+ $100
Broker fee+ $350
Total turnkey$770
Estimate for a typical batch (average shipment value — $318). Exact costing depends on your volume and terms.
Included in the project
4
CONTRACT
⏱ 2 days

We prepare the deal contract

“I've agreed terms with the seller — I need a proper contract”

Contract — sample structureRU / EN
INTERNATIONAL SALE AND PURCHASE AGREEMENT
«__» ________ 2026 г.
Seller: KIT FACTORY GATE 24, Germany
Buyer: company “__________”, your country
Subject: Articles of plastics and articles of other materials of heading no. 3901 to 3914, n.e.c. in chapter 39 · HS codes 3926909706
Terms: Incoterms — to be agreed
Price · Arbitration · Force majeure · ███████████
Prepared for bank currency control
Bilingual contract
Sample structure. We tailor the contract to your specific deal.
Included in the project

Import preparation: what's included

We prepare your import from this supplier in Germany — articles of plastics and articles of other materials of heading no. 3901 to 3914, n.e.c. in chapter 39 (HS 3926909706): we vet the company against real shipments, negotiate in its language, calculate the full delivery cost to you (duty, VAT, freight to border) and prepare a foreign trade contract for your bank's currency control.

FAQ

What do you know about the supplier KIT FACTORY GATE 24?+
Based on shipment data: 19 shipments over 2025, main product — Articles of plastics and articles of other materials of heading no. 3901 to 3914, n.e.c. in chapter 39, average shipment value — $318. A total of 10 HS product groups. The more confirmed shipments, the higher the reliability rating.
What does project management include?+
We analyse and vet this supplier (shipments, prices, rating), negotiate in their language, calculate the delivery cost to you, and prepare a contract suited to your bank. Logistics and customs clearance are not included.
How do negotiations with the supplier work?+
We send a quote request, including for “Articles of plastics and articles of other materials of heading no. 3901 to 3914, n.e.c. in chapter 39”, correspond in English and the supplier's language, clarify prices, minimum order quantity, lead times and willingness to work with your country. The result is a report with the supplier's answers.
How much does delivery from Germany cost?+
It depends on volume, weight and shipping method. For reference, this supplier’s average shipment value is $318. We provide a full costing including duties, VAT and broker fees as part of project management.
Can we pay as a legal entity?+
Yes. We accept payment by invoice from any legal entity — we just need your details. Closing documents (act, offer agreement) are issued on our side.
from $250/mo