🇵🇱
Poland ITM Import preparation

International Tobacco Machinery (ITM) Poland Sp. z o.o.

?About the companyShipment volume is declining toward the end of the period — worth checking current relevance.25 HS product groups in shipment history — a clear picture of the company's range.71 shipments on record — the basis for the reliability rating.

Supplier from Poland · P.O. Box 113 ul. Andrzeja Stanikowski 2. 71 shipments over 2025–2026, average price $518. Main product — machinery; for preparing or making up tobacco, n.e.c. in this chapter (HS 8478900000). We'll prepare your import from this supplier — from analysis to contract.

Vedzilla is an import-preparation service: we help set up imports from this company to your country (CIS, Central Asia). Logistics and customs clearance are arranged by the importer.

Turnkey project management — from $250/mo
Free review · we reply during business hours
Shipments
71
rating
Period
2025–2026
of shipments
Average price
$518
per shipment
Total volume
$36 745
at least
Product groups: 3917320009·Tubes, pipes and hoses and fittings thereof (for example, joints, elbows, flanges), of plastics 8412310009·Engines and motors; n.e.c. (e.g. reaction engines, hydraulic power engines, pneumatic power engines) 5910000000·Textiles; transmission or conveyor belts or belting, of textile material, whether or not impregnated, coated, covered or laminated with plastics, or reinforced with metal or other material 8208900000·Knives and cutting blades, for machines or for mechanical appliances 8478900000·Machinery; for preparing or making up tobacco, n.e.c. in this chapter 7315119000·Chain and parts thereof, of iron or steel 4010390000·Conveyor or transmission belts or belting, of vulcanised rubber 9603500009·Brooms, brushes (including parts of machines), hand operated floor sweepers, mops and feather dusters; knots and tufts for broom or brush making; paint pads and rollers; squeegees

What International Tobacco Machinery (ITM) Poland Sp. z o.o. supplies

25 HS codes · prices from real shipments
HS codeGoodsShipmentsPrice, $ (min–max)
8478900000
Machinery; for preparing or making up tobacco, n.e.c. in this chapter
045002206 РУЧКА ДВЕРЦЫ для сигаретного оборудования LATCH, PADDLE pc. 29 $21 – $1 772
5910000000
Textiles; transmission or conveyor belts or belting, of textile material, whether or not impregnated, coated, covered or laminated with plastics, or reinforced with metal or other material
OPENED TIMING BELT made of textile materials for cigarette equipment - 6 $10 – $2 313
4010390000
Conveyor or transmission belts or belting, of vulcanised rubber
042103397 РЕМЕНЬ из вулканизованной резины для сигаретного оборудовани 6 $8 – $135
9603500009
Brooms, brushes (including parts of machines), hand operated floor sweepers, mops and feather dusters; knots and tufts for broom or brush making; paint pads and rollers; squeegees
99304017 ЩЁТКА для сигаретного оборудования PIPE BRUSH ASSYpc. 4 $44 – $268
3917320009
Tubes, pipes and hoses and fittings thereof (for example, joints, elbows, flanges), of plastics
PLASTIC TUBES for cigarette equipment TUBE- 100 mm. - 2.05 kg of cardb 4 $167 – $273
3926909709
Articles of plastics and articles of other materials of heading no. 3901 to 3914, n.e.c. in chapter 39
042102411 РЕМЕНЬ ЗУБЧАТЫЙ пластиковый для сигаретного оборудования BEL 2 $15 – $15
3917390008
Tubes, pipes and hoses and fittings thereof (for example, joints, elbows, flanges), of plastics
050006836 ТРУБА НА ВАКУУМ для сигаретного оборудования TUBE, FLEXIBLE 2 $49 – $1 421
9032108900
Regulating or controlling instruments and apparatus; automatic type
1. 0110-99023 ТЕМПЕРАТУРНЫЙ СЕНСОР для сигаретного оборудования/ TEMPE 1 $133 – $133
and 17 more product groups · Request full range and pricing breakdown →
Turnkey import preparation
Monthly project management: supplier analysis, negotiations, delivery costing and contract preparation. You get a result, not disjointed services. Logistics and customs are not included.
from $250/mo
First review is free

How the project works

4 stages: analysis → negotiations → costing → contract
1
SHIPMENT ANALYSIS
⏱ 3 days

We analyze the supplier

“I want to know if this supplier is reliable — how much they ship, what volumes”

Shipments by monthrating
37
25
9
JanDecFeb
Shipment trend and regularity
Product groups (HS codes) and prices
Conclusion: reliability and what to watch for
Included in the project
2
NEGOTIATIONS
⏱ 5 days

We send a request

“I want to start working with this supplier — are they open to negotiate?”

This is what a negotiation report looks likesample
Vedzilla → seller
Request for quotation. Delivery to your country. MOQ and prices?
seller reply (sample)
MOQ 200 pcs. Lead time 3–4 weeks. Ready to work with your region.
Main product per shipment data: Machinery; for preparing or making up tobacco, n.e.c. in this chapter · HS codes 8478900000
Indicative price from shipments: $518
We'll request a quote, MOQ, lead time and readiness to ship to your country
Illustration of the format. We handle correspondence with the seller as part of the project — real answers will be in your report.
Included in the project
3
DELIVERY COST
⏱ 1 day

We calculate the full delivery cost

“I want to know how much delivery to us will cost”

Delivery cost → to youexample
Goods cost (EXW)$500
Freight to border+ $40
Duty + VAT on import+ $170
Broker fee+ $350
Total turnkey$1 060
Estimate for a typical batch (average shipment value — $518). Exact costing depends on your volume and terms.
Included in the project
4
CONTRACT
⏱ 2 days

We prepare the deal contract

“I've agreed terms with the seller — I need a proper contract”

Contract — sample structureRU / EN
INTERNATIONAL SALE AND PURCHASE AGREEMENT
«__» ________ 2026 г.
Seller: International Tobacco Machinery (ITM) Poland Sp. z o.o., Poland
Buyer: company “__________”, your country
Subject: Machinery; for preparing or making up tobacco, n.e.c. in this chapter · HS codes 8478900000
Terms: Incoterms — to be agreed
Price · Arbitration · Force majeure · ███████████
Prepared for bank currency control
Bilingual: Russian + English
Sample structure. We tailor the contract to your specific deal.
Included in the project

Import preparation: what's included

We prepare your import from this supplier in Poland — machinery; for preparing or making up tobacco, n.e.c. in this chapter (HS 8478900000): we vet the company against real shipments, negotiate in its language, calculate the full delivery cost to you (duty, VAT, freight to border) and prepare a foreign trade contract for your bank's currency control.

Other suppliers: Machinery and mechanical appliances

FAQ

What do you know about the supplier International Tobacco Machinery (ITM) Poland Sp. z o.o.?+
Based on shipment data: 71 shipments over 2025–2026, main product — Machinery; for preparing or making up tobacco, n.e.c. in this chapter, average shipment value — $518. A total of 25 HS product groups. The more confirmed shipments, the higher the reliability rating.
What does project management include?+
We analyse and vet this supplier (shipments, prices, rating), negotiate in their language, calculate the delivery cost to you, and prepare a contract suited to your bank. Logistics and customs clearance are not included.
How do negotiations with the supplier work?+
We send a quote request, including for “Machinery; for preparing or making up tobacco, n.e.c. in this chapter”, correspond in English and the supplier's language, clarify prices, minimum order quantity, lead times and willingness to work with your country. The result is a report with the supplier's answers.
How much does delivery from Poland cost?+
It depends on volume, weight and shipping method. For reference, this supplier’s average shipment value is $518. We provide a full costing including duties, VAT and broker fees as part of project management.
Can we pay as a legal entity?+
Yes. Payment by invoice for organizations — send your details and we'll issue an invoice. We work with any type of legal entity. Closing documents (act, offer agreement) are provided.
from $250/mo