🇩🇪 Germany Goodwell Import preparation

HYDRO SYSTEMS GMBH & CO. KG

?About the companyShipment volume is declining toward the end of the period — worth checking current relevance.28 HS product groups in shipment history — a clear picture of the company's range.55 shipments on record — the basis for the reliability rating.

Supplier from Germany · AHFELDSTRASSE 10, 77781 BIBERBACH. 55 shipments over 2025–2026, average price $4,405. Main product — screws, bolts, nuts, coach screws, screw hooks, rivets, cotters, cotter-pins, washers (including spring washers) and similar articles, of iron or steel (HS 7318159008). We'll prepare your import from this supplier — from analysis to contract.

Vedzilla is an import-preparation service: we help set up imports from this company to your country (CIS, Central Asia). Logistics and customs clearance are arranged by the importer.

Turnkey project management — from $250/mo
Free review · we reply during business hours
Shipments
55
rating
Period
2025–2026
of shipments
Average price
$4 405
per shipment
Total volume
$242 302
at least
Product groups: 3926909709·Articles of plastics and articles of other materials of heading no. 3901 to 3914, n.e.c. in chapter 39 4009220009·Tubes, pipes and hoses, of vulcanised rubber (other than hard rubber), with or without their fittings (e.g. joints, elbows, flanges) 4009320001 4009420000 7318159008·Screws, bolts, nuts, coach screws, screw hooks, rivets, cotters, cotter-pins, washers (including spring washers) and similar articles, of iron or steel 7318169109 7318220008 7326905000·Iron or steel; articles, n.e.c. in chapter 73

What HYDRO SYSTEMS GMBH & CO. KG supplies

28 HS codes · prices from real shipments
HS codeGoodsShipmentsPrice, $ (min–max)
7318159008
Screws, bolts, nuts, coach screws, screw hooks, rivets, cotters, cotter-pins, washers (including spring washers) and similar articles, of iron or steel
Towbar shear bolt, part number 00432-275-000, for civil aircraft, 10 p 8 $113 – $3 743
4009220009
Tubes, pipes and hoses, of vulcanised rubber (other than hard rubber), with or without their fittings (e.g. joints, elbows, flanges)
Hose 104230199 - Vulcanized rubber hose, part number 104230199, for - 6 $290 – $6 745
9026204000
Instruments, apparatus for measuring or checking the flow, level, pressure of liquids, gases (e.g. flow meters, heat meters etc), not instruments and apparatus of heading no. 9014, 9015, 9028 or 9032
1. Маномерт- 2 шт / 00127-028-000 Manometer, новый, год выпуска 2025 - 6 $334 – $2 340
7318169109 1. Шестигранная куполообразная колпачковая гайка - 32шт. / 51757 Hexag 4 $83 – $302
4009420000 1. Заправочный шланг - 3 шт. (для накачивания колес шасси ВС) / NB3070 2 $796 – $796
7415210000
Copper, nails, tacks, drawing pins, staples (not those of heading no. 8305) and the like, of copper or iron or steel with heads of copper; screws bolts, nuts, screws hooks, rivets, cotters, washers
Copper gasket part No. -053- for maintenance and repair of Western air 2 $33 – $33
8425420000
Pulley tackle and hoists other than skip hoists; winches and capstans; jacks
1. Гидроподъемник -2 шт. 90т / RC9002A2A0A10 Axle jack. Серия номер: 1 2 $20 733 – $25 257
8481809902
Taps, cocks, valves and similar appliances for pipes, boiler shells, tanks, vats or the like, including pressure-reducing valves and thermostatically controlled valves
1. Заправочный переходник - 10 шт. (для работ по накачке колес шасси В 2 $866 – $866
and 20 more product groups · Request full range and pricing breakdown →
Turnkey import preparation
Monthly project management: supplier analysis, negotiations, delivery costing and contract preparation. You get a result, not disjointed services. Logistics and customs are not included.
from $250/mo
First review is free

How the project works

4 stages: analysis → negotiations → costing → contract
1
SHIPMENT ANALYSIS
⏱ 3 days

We analyze the supplier

“I want to know if this supplier is reliable — how much they ship, what volumes”

Shipments by monthrating
2
2
1
4
4
5
2
1
OctNovDecJanFebMarAprMay
Shipment trend and regularity
Product groups (HS codes) and prices
Conclusion: reliability and what to watch for
Included in the project
2
NEGOTIATIONS
⏱ 5 days

We send a request

“I want to start working with this supplier — are they open to negotiate?”

This is what a negotiation report looks likesample
Vedzilla → seller
Request for quotation. Delivery to your country. MOQ and prices?
seller reply (sample)
MOQ 200 pcs. Lead time 3–4 weeks. Ready to work with your region.
Main product per shipment data: Screws, bolts, nuts, coach screws, screw hooks, rivets, cotters, cotter-pins, washers (including spring washers) and similar articles, of iron or steel · HS codes 7318159008
Indicative price from shipments: $4 405
We'll request a quote, MOQ, lead time and readiness to ship to your country
Illustration of the format. We handle correspondence with the seller as part of the project — real answers will be in your report.
Included in the project
3
DELIVERY COST
⏱ 1 day

We calculate the full delivery cost

“I want to know how much delivery to us will cost”

Delivery cost → to youexample
Goods cost (EXW)$4 400
Freight to border+ $350
Duty + VAT on import+ $1 520
Broker fee+ $350
Total turnkey$6 620
Estimate for a typical batch (average shipment value — $4 405). Exact costing depends on your volume and terms.
Included in the project
4
CONTRACT
⏱ 2 days

We prepare the deal contract

“I've agreed terms with the seller — I need a proper contract”

Contract — sample structureRU / EN
INTERNATIONAL SALE AND PURCHASE AGREEMENT
«__» ________ 2026 г.
Seller: HYDRO SYSTEMS GMBH & CO. KG, Germany
Buyer: company “__________”, your country
Subject: Screws, bolts, nuts, coach screws, screw hooks, rivets, cotters, cotter-pins, washers (including spring washers) and similar articles, of iron or steel · HS codes 7318159008
Terms: Incoterms — to be agreed
Price · Arbitration · Force majeure · ███████████
Prepared for bank currency control
Bilingual contract
Sample structure. We tailor the contract to your specific deal.
Included in the project

Import preparation: what's included

We prepare your import from this supplier in Germany — screws, bolts, nuts, coach screws, screw hooks, rivets, cotters, cotter-pins, washers (including spring washers) and similar articles, of iron or steel (HS 7318159008): we vet the company against real shipments, negotiate in its language, calculate the full delivery cost to you (duty, VAT, freight to border) and prepare a foreign trade contract for your bank's currency control.

FAQ

What do you know about the supplier HYDRO SYSTEMS GMBH & CO. KG?+
Based on shipment data: 55 shipments over 2025–2026, main product — Screws, bolts, nuts, coach screws, screw hooks, rivets, cotters, cotter-pins, washers (including spring washers) and similar articles, of iron or steel, average shipment value — $4,405. A total of 28 HS product groups. The more confirmed shipments, the higher the reliability rating.
What does project management include?+
We analyse and vet this supplier (shipments, prices, rating), negotiate in their language, calculate the delivery cost to you, and prepare a contract suited to your bank. Logistics and customs clearance are not included.
How do negotiations with the supplier work?+
We send a quote request, including for “Screws, bolts, nuts, coach screws, screw hooks, rivets, cotters, cotter-pins, washers (including spring washers) and similar articles, of iron or steel”, correspond in English and the supplier's language, clarify prices, minimum order quantity, lead times and willingness to work with your country. The result is a report with the supplier's answers.
How much does delivery from Germany cost?+
It depends on volume, weight and shipping method. For reference, this supplier’s average shipment value is $4,405. We provide a full costing including duties, VAT and broker fees as part of project management.
Can we pay as a legal entity?+
Yes. Payment by invoice for organizations — send your details and we'll issue an invoice. We work with any type of legal entity. Closing documents (act, offer agreement) are provided.
from $250/mo