🇧🇷
Brazil SON Import preparation

DSV AIR & SEA

?About the companyShipments are growing — recent months show higher volumes than the start of the period.75 HS product groups in shipment history — a clear picture of the company's range.907 shipments on record — the basis for the reliability rating.

Supplier from Brazil · AV. J. R. MARINHO, 85, 12TH FLOOR, SUITES 121-122, CIDADE MONCOES, SAO PAULO, 4576-1, BRAZIL. 907 shipments over 2025–2026, average price $59,491. Main product — iron or steel (excluding cast iron); tubes, pipes and hollow profiles (not seamless), n.e.c. in chapter 73 (HS 7306307701). We'll prepare your import from this supplier — from analysis to contract.

Vedzilla is an import-preparation service: we help set up imports from this company to your country (CIS, Central Asia). Logistics and customs clearance are arranged by the importer.

Turnkey project management — from $250/mo
Free review · we reply during business hours
Shipments
907
rating
Period
2025–2026
of shipments
Average price
$59 491
per shipment
Total volume
$53 958 719
at least
Product groups: 8511400002·Ignition or starting equipment; used for spark-ignition or compression-ignition internal combustion engines; generators and cut outs used in conjunction with such engines 8708922009·Motor vehicles; parts and accessories, of heading no. 8701 to 8705 3917390008·Tubes, pipes and hoses and fittings thereof (for example, joints, elbows, flanges), of plastics 8421310009·Centrifuges, including centrifugal dryers; filtering or purifying machinery and apparatus for liquids or gases 3926909702·Articles of plastics and articles of other materials of heading no. 3901 to 3914, n.e.c. in chapter 39 7306307701·Iron or steel (excluding cast iron); tubes, pipes and hollow profiles (not seamless), n.e.c. in chapter 73 4009220001·Tubes, pipes and hoses, of vulcanised rubber (other than hard rubber), with or without their fittings (e.g. joints, elbows, flanges) 8708949908·Motor vehicles; parts and accessories, of heading no. 8701 to 8705

What DSV AIR & SEA supplies

75 HS codes · prices from real shipments
HS codeGoodsShipmentsPrice, $ (min–max)
7306307701
Iron or steel (excluding cast iron); tubes, pipes and hollow profiles (not seamless), n.e.c. in chapter 73
A.M. Onix industrial assembly parts. FUEL TANK FILLER PIPE (Fuel tank 67 $2 632 – $536 760
3926909709
Articles of plastics and articles of other materials of heading no. 3901 to 3914, n.e.c. in chapter 39
A.M. Onix.Tracker industrial assembly parts, FLIP-DOWN GEARBOX COVER, 62 $160 – $127 630
8708211000
Motor vehicles; parts and accessories, of heading no. 8701 to 8705
Tracker.Onix industrial vehicle assembly parts - RETRACTOR ASM-R.SEAT 49 $463 – $417 861
8708301000
Motor vehicles; parts and accessories, of heading no. 8701 to 8705
A.M. Tracker TAPE industrial assembly parts, 2,400 pcs.: 40.86 kg Cont 47 $666 – $528 158
7320909001
Springs and leaves for springs, of iron or steel
A.M. Tracker Industrial Assembly Parts: SPRING, REAR COIL, Qty. 3,456 47 $5 324 – $208 255
8302300001
Base metal mountings, fittings and similar articles for furniture, doors, staircases, windows, trunks, chests etc, castors with mountings of base metal, automatic door closers of base metal
A.M. Onix Industrial Assembly Parts: BRACKET, SELECTOR CABLE, AND SHIF 43 $655 – $39 736
8708509901
Motor vehicles; parts and accessories, of heading no. 8701 to 8705
A.M. Onix.Tracker industrial assembly parts, HALF-AXLE DRIVE, DRIVE WH 42 $2 923 – $361 961
8708922009
Motor vehicles; parts and accessories, of heading no. 8701 to 8705
A.M. production parts, Onix GASKET, CATALYST NEUTRALIZER (Part No. 251 41 $1 346 – $56 090
and 67 more product groups · Request full range and pricing breakdown →
Turnkey import preparation
Monthly project management: supplier analysis, negotiations, delivery costing and contract preparation. You get a result, not disjointed services. Logistics and customs are not included.
from $250/mo
First review is free

How the project works

4 stages: analysis → negotiations → costing → contract
1
SHIPMENT ANALYSIS
⏱ 3 days

We analyze the supplier

“I want to know if this supplier is reliable — how much they ship, what volumes”

Shipments by monthrating
60
50
25
52
52
76
99
107
OctNovDecJanFebMarAprMay
Shipment trend and regularity
Product groups (HS codes) and prices
Conclusion: reliability and what to watch for
Included in the project
2
NEGOTIATIONS
⏱ 5 days

We send a request

“I want to start working with this supplier — are they open to negotiate?”

This is what a negotiation report looks likesample
Vedzilla → seller
Request for quotation. Delivery to your country. MOQ and prices?
seller reply (sample)
MOQ 200 pcs. Lead time 3–4 weeks. Ready to work with your region.
Main product per shipment data: Iron or steel (excluding cast iron); tubes, pipes and hollow profiles (not seamless), n.e.c. in chapter 73 · HS codes 7306307701
Indicative price from shipments: $59 491
We'll request a quote, MOQ, lead time and readiness to ship to your country
Illustration of the format. We handle correspondence with the seller as part of the project — real answers will be in your report.
Included in the project
3
DELIVERY COST
⏱ 1 day

We calculate the full delivery cost

“I want to know how much delivery to us will cost”

Delivery cost → to youexample
Goods cost (EXW)$59 500
Freight to border+ $4 760
Duty + VAT on import+ $20 560
Broker fee+ $350
Total turnkey$85 170
Estimate for a typical batch (average shipment value — $59 491). Exact costing depends on your volume and terms.
Included in the project
4
CONTRACT
⏱ 2 days

We prepare the deal contract

“I've agreed terms with the seller — I need a proper contract”

Contract — sample structureRU / EN
INTERNATIONAL SALE AND PURCHASE AGREEMENT
«__» ________ 2026 г.
Seller: DSV AIR & SEA, Brazil
Buyer: company “__________”, your country
Subject: Iron or steel (excluding cast iron); tubes, pipes and hollow profiles (not seamless), n.e.c. in chapter 73 · HS codes 7306307701
Terms: Incoterms — to be agreed
Price · Arbitration · Force majeure · ███████████
Prepared for bank currency control
Bilingual contract
Sample structure. We tailor the contract to your specific deal.
Included in the project

Import preparation: what's included

We prepare your import from this supplier in Brazil — iron or steel (excluding cast iron); tubes, pipes and hollow profiles (not seamless), n.e.c. in chapter 73 (HS 7306307701): we vet the company against real shipments, negotiate in its language, calculate the full delivery cost to you (duty, VAT, freight to border) and prepare a foreign trade contract for your bank's currency control.

FAQ

What do you know about the supplier DSV AIR & SEA?+
Based on shipment data: 907 shipments over 2025–2026, main product — Iron or steel (excluding cast iron); tubes, pipes and hollow profiles (not seamless), n.e.c. in chapter 73, average shipment value — $59,491. A total of 75 HS product groups. The more confirmed shipments, the higher the reliability rating.
What does project management include?+
We analyse and vet this supplier (shipments, prices, rating), negotiate in their language, calculate the delivery cost to you, and prepare a contract suited to your bank. Logistics and customs clearance are not included.
How do negotiations with the supplier work?+
We send a quote request, including for “Iron or steel (excluding cast iron); tubes, pipes and hollow profiles (not seamless), n.e.c. in chapter 73”, correspond in English and the supplier's language, clarify prices, minimum order quantity, lead times and willingness to work with your country. The result is a report with the supplier's answers.
How much does delivery from Brazil cost?+
It depends on volume, weight and shipping method. For reference, this supplier’s average shipment value is $59,491. We provide a full costing including duties, VAT and broker fees as part of project management.
Can we pay as a legal entity?+
Yes. Payment by invoice for organizations — send your details and we'll issue an invoice. We work with any type of legal entity. Closing documents (act, offer agreement) are provided.
from $250/mo