🇮🇹
Italy Hisense Import preparation

Danieli & C. Officine Meccaniche S.p.A.

?About the companyShipment volume is declining toward the end of the period — worth checking current relevance.71 HS product groups in shipment history — a clear picture of the company's range.505 shipments on record — the basis for the reliability rating.

Supplier from Italy · Italy, 33042 Burttrio (Udine), via Nazionale, 41. 505 shipments over 2025–2026, average price $8,008. Main product — tubing; flexible, with or without fittings, of base metal (HS 8307100009). We'll prepare your import from this supplier — from analysis to contract.

Vedzilla is an import-preparation service: we help set up imports from this company to your country (CIS, Central Asia). Logistics and customs clearance are arranged by the importer.

Turnkey project management — from $250/mo
Free review · we reply during business hours
Shipments
505
rating
Period
2025–2026
of shipments
Average price
$8 008
per shipment
Total volume
$4 044 182
at least
Product groups: 3824996500·Prepared binders for foundry moulds or cores; chemical products and preparations of the chemical or allied industries (including those consisting of mixtures of natural products), not elsewhere specified or included 3926909709·Articles of plastics and articles of other materials of heading no. 3901 to 3914, n.e.c. in chapter 39 4016930005·Articles of vulcanised rubber other than hard rubber, n.e.c. in chapter 40 7208539000·Iron or non-alloy steel; flat-rolled products of a width of 600mm or more, hot-rolled, not clad, plated or coated 7216210000·Iron or non-alloy steel, angles, shapes and sections 7304312009·Tubes, pipes and hollow profiles, seamless, of iron (other than cast iron) or steel 7304399209 7306408008·Iron or steel (excluding cast iron); tubes, pipes and hollow profiles (not seamless), n.e.c. in chapter 73

What Danieli & C. Officine Meccaniche S.p.A. supplies

71 HS codes · prices from real shipments
HS codeGoodsShipmentsPrice, $ (min–max)
8307100009
Tubing; flexible, with or without fittings, of base metal
MODERNIZATION AND EXPANSION OF EXISTING CAPACITIES BY CONSTRUCTING A M 36 $34 – $368
8454309004
Converters, ladles, ingot moulds and casting machines; of a kind used metallurgy or in metal foundries
МОДЕРНИЗАЦИЯ И РАСШИРЕНИЕ СУЩЕСТВУЮЩИХ МОЩНОСТЕЙ ПУТЁМ СТРОИТЕЛЬСТВА М 27 $464 – $36 136
8421210009
Centrifuges, including centrifugal dryers; filtering or purifying machinery and apparatus for liquids or gases
MODERNIZATION AND EXPANSION OF EXISTING CAPACITIES BY CONSTRUCTING A M 24 $768 – $141 681
8431498009
Machinery parts; used solely or principally with the machinery of heading no. 8425 to 8430
Modernization and expansion of existing facilities through the constru 23 $435 – $21 502
7312109809
Stranded wire, ropes, cables, plaited bands, slings and the like, of iron or steel, not electrically insulated
Modernization and expansion of existing facilities through the constru 22 $527 – $17 042
8481808190
Taps, cocks, valves and similar appliances for pipes, boiler shells, tanks, vats or the like, including pressure-reducing valves and thermostatically controlled valves
MODERNIZATION AND EXPANSION OF EXISTING CAPACITIES BY CONSTRUCTING A M 22 $34 – $5 862
8514390009
Industrial or laboratory electric furnaces and ovens (including those functioning by induction or dielectric loss); other industrial or laboratory equipment for the heat treatment of materials by induction or dielectric loss
MODERNIZATION AND EXPANSION OF EXISTING CAPACITIES BY CONSTRUCTING A M 21 $398 – $213 973
7326909807
Iron or steel; articles, n.e.c. in chapter 73
MODERNIZATION AND EXPANSION OF EXISTING CAPACITIES BY CONSTRUCTING A M 20 $1 – $878
and 63 more product groups · Request full range and pricing breakdown →
Turnkey import preparation
Monthly project management: supplier analysis, negotiations, delivery costing and contract preparation. You get a result, not disjointed services. Logistics and customs are not included.
from $250/mo
First review is free

How the project works

4 stages: analysis → negotiations → costing → contract
1
SHIPMENT ANALYSIS
⏱ 3 days

We analyze the supplier

“I want to know if this supplier is reliable — how much they ship, what volumes”

Shipments by monthrating
12
3
3
48
1
242
114
3
SepOctNovDecJanMarAprMay
Shipment trend and regularity
Product groups (HS codes) and prices
Conclusion: reliability and what to watch for
Included in the project
2
NEGOTIATIONS
⏱ 5 days

We send a request

“I want to start working with this supplier — are they open to negotiate?”

This is what a negotiation report looks likesample
Vedzilla → seller
Request for quotation. Delivery to your country. MOQ and prices?
seller reply (sample)
MOQ 200 pcs. Lead time 3–4 weeks. Ready to work with your region.
Main product per shipment data: Tubing; flexible, with or without fittings, of base metal · HS codes 8307100009
Indicative price from shipments: $8 008
We'll request a quote, MOQ, lead time and readiness to ship to your country
Illustration of the format. We handle correspondence with the seller as part of the project — real answers will be in your report.
Included in the project
3
DELIVERY COST
⏱ 1 day

We calculate the full delivery cost

“I want to know how much delivery to us will cost”

Delivery cost → to youexample
Goods cost (EXW)$8 000
Freight to border+ $640
Duty + VAT on import+ $2 760
Broker fee+ $350
Total turnkey$11 750
Estimate for a typical batch (average shipment value — $8 008). Exact costing depends on your volume and terms.
Included in the project
4
CONTRACT
⏱ 2 days

We prepare the deal contract

“I've agreed terms with the seller — I need a proper contract”

Contract — sample structureRU / EN
INTERNATIONAL SALE AND PURCHASE AGREEMENT
«__» ________ 2026 г.
Seller: Danieli & C. Officine Meccaniche S.p.A., Italy
Buyer: company “__________”, your country
Subject: Tubing; flexible, with or without fittings, of base metal · HS codes 8307100009
Terms: DAP
Price · Arbitration · Force majeure · ███████████
Prepared for bank currency control
Bilingual contract
Sample structure. We tailor the contract to your specific deal.
Included in the project

Import preparation: what's included

We prepare your import from this supplier in Italy — tubing; flexible, with or without fittings, of base metal (HS 8307100009): we vet the company against real shipments, negotiate in its language, calculate the full delivery cost to you (duty, VAT, freight to border) and prepare a foreign trade contract for your bank's currency control.

Other suppliers: Miscellaneous articles of base metal

FAQ

What do you know about the supplier Danieli & C. Officine Meccaniche S.p.A.?+
Based on shipment data: 505 shipments over 2025–2026, main product — Tubing; flexible, with or without fittings, of base metal, average shipment value — $8,008. A total of 71 HS product groups. The more confirmed shipments, the higher the reliability rating.
What does project management include?+
From vetting to signature: we review shipments and pricing, negotiate in the supplier's language, cost the delivery in full and prepare the contract. Logistics and customs clearance stay on your side.
How do negotiations with the supplier work?+
We send a quote request, including for “Tubing; flexible, with or without fittings, of base metal”, correspond in English and the supplier's language, clarify prices, minimum order quantity, lead times and willingness to work with your country. The result is a report with the supplier's answers.
How much does delivery from Italy cost?+
It depends on volume, weight and shipping method. For reference, this supplier’s average shipment value is $8,008. We provide a full costing including duties, VAT and broker fees as part of project management.
Can we pay as a legal entity?+
Yes. We accept payment by invoice from any legal entity — we just need your details. Closing documents (act, offer agreement) are issued on our side.
from $250/mo